# The Electricity (Individual Exemptions from the Requirement for a Generation Licence) (Scotland) Order 2022, Article 5: Conditions on exemption granted by article 3(b)


The exemption granted by article 3(b) of this Order is subject to compliance with the following conditions—
(a) Sandy Knowe Wind Farm is connected to the total system;
(b) Sandy Knowe Wind Farm does not export more than 100 megawatts of electrical power to the total system, except in circumstances outside the reasonable control of Sandy Knowe Wind Farm Limited; and
(c) Sandy Knowe Wind Farm Limited is not a licensed generator in respect of Sandy Knowe Wind Farm.

---
Source: https://www.legislation.gov.uk/uksi/2022/702/article/5 (the official version)
Page: https://openlegislation.uk/electricity-individual-exemptions-from-the-requirement-for-a-generation-licence-scotland-order-2022/article-5
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

