# The Electricity (Individual Exemptions from the Requirement for a Transmission Licence) (Coronavirus) Order 2020, Article 4: Exemption from section 4(1)(b) of the Act (prohibition on unlicensed transmission of electricity for supply) for Hornsea 1 Limited


(1) Exemption is granted from section 4(1)(b) of the Act (prohibition on unlicensed transmission of electricity for supply) to Hornsea 1 Limited in respect of transmission taking place over the transmission system connected to the Hornsea 1 Offshore Wind Farm.
(2) The exemption in paragraph (1) of this Article shall apply for the period beginning with 15th January 2021 and ending with the earlier of—
(a) the day after the day on which the transmission system connected to Hornsea 1 Offshore Wind Farm is transferred to a successful bidder;
(b) 14th July 2021.
(3) In this Article—
(a) “Hornsea 1 Limited” means Hornsea 1 Limited, a company registered in England and Wales with the company number 07640868;
(b) “Hornsea 1 Offshore Wind Farm” means the generating station located approximately 102 kilometers to 126 kilometres from the shore, in the Southern North Sea, off the coast of East Yorkshire, its coordinates at its central point being Latitude 53.88328274 and Longitude 1.9218357.

---
Source: https://www.legislation.gov.uk/uksi/2020/815/article/4 (the official version)
Page: https://openlegislation.uk/electricity-individual-exemptions-from-the-requirement-for-a-transmission-licence-coronavirus-order-2020/article-4
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

