# The Electricity Network Codes and Guidelines (System Operation and Connection) (Amendment etc.) (EU Exit) Regulations 2019, Paragraph 101

Extent: E+W+S

(1) Article 156 is amended as follows.
(2) In paragraph 1, for “the same synchronous area in accordance with Articles 153, 163, 173 and 174” substitute “ the GB synchronous area in accordance with Articles 153 and 163 ”.
(3) In paragraph 2—
(a) in the opening words before point (a), for “a synchronous area” substitute “ the GB synchronous area ”; and
(b) omit point (d).
(4) Omit paragraph 3.
(5) In paragraph 6—
(a) omit point (a);
(b) in point (b), for “GB, IE/NI and Nordic synchronous areas” substitute “ the GB synchronous area ”.
(6) In paragraphs 7 and 8, for “and IE/NI synchronous areas” substitute “ synchronous area ”.
(7) Omit paragraphs 9 to 11.
(8) For paragraph 13, substitute—
“13 A FCR provider using FCR providing units or FCR providing group with an energy reservoir that limits their capability to provide FCR shall ensure the recovery of the energy reservoirs in the positive or negative directions for the GB synchronous area, using the methods specified in the synchronous area operational agreement..”.

---
Source: https://www.legislation.gov.uk/uksi/2019/533/schedule/1/paragraph/101 (the official version)
Page: https://openlegislation.uk/electricity-network-codes-and-guidelines-system-operation-and-connection-amendment-etc-eu-exit-regulations-2019/schedule-1/paragraph-101
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

