# The Electricity Network Codes and Guidelines (System Operation and Connection) (Amendment etc.) (EU Exit) Regulations 2019, Paragraph 7

Extent: E+W+S

(1) Article 6 is amended as follows.
(2) In paragraph 1—
(a) in the first sentence—
(i) for “Each” substitute “ The ”;
(ii) for “2 and 3” substitute “ 2, 3 and 4 ”;
(b) omit the second and third sentences.
(3) In paragraph 2—
(a) in the opening words before point (a)—
(i) for “all regulatory authorities of the Union on which a Member State” substitute “ the regulatory authority, on which the Secretary of State ”;
(ii) for “concerned regulatory authority” substitute “ regulatory authority ”;
(b) omit points (b) and (c).
(4) In paragraph 3—
(a) in the opening words before point (a)—
(i) for “all regulatory authorities of the concerned region” substitute “ the regulatory authority ”;
(ii) for “a Member State” substitute “ the Secretary of State ”;
(iii) after “an opinion to the”, omit “concerned”.
(b) in point (a), omit “for each synchronous area”;
(c) omit points (b) and (c);
(d) in point (d)—
(i) in subpoint (iv), for “and IE/NI synchronous areas” substitute “ synchronous area ”;
(ii) omit subpoints (v) and (vi);
(iii) in subpoint (vii), omit “for synchronous areas other than CE and”;
(iv) omit subpoints (viii) to (x).
(5) In paragraph 4—
(a) for the opening words before point (a), substitute “ The following terms and conditions or methodologies shall be subject to individual approval by the regulatory authority— ”;
(b) in point (a), for “and IE/NI synchronous areas” substitute “ synchronous area ”;
(c) omit point (e).
(6) In paragraph 5, for “Member States may require prior approval by the competent regulatory authority” substitute “ the regulatory authority may require the relevant system operator or TSO to obtain its prior approval ”.
(7) In paragraph 6, omit the second and third sentences.
(8) Omit paragraphs 7 and 8.
(9) In paragraph 9—
(a) for “a single designated entity”, substitute “ the regulatory authority ”;
(b) for “designated entity” substitute “ regulatory authority ”.

---
Source: https://www.legislation.gov.uk/uksi/2019/533/schedule/1/paragraph/7 (the official version)