# The Electricity Network Codes and Guidelines (System Operation and Connection) (Amendment etc.) (EU Exit) Regulations 2019, Paragraph 21

Extent: E+W+S

(1) Article 36 is amended as follows.
(2) In paragraph 2, for “relevant regulatory authority in accordance with Article 37 of Directive 2009/72/EC” substitute “ regulatory authority ”.
(3) In paragraph 3—
(a) omit point (a);
(b) in point (e), omit “and (2)”.
(4) In paragraph 4—
(a) in point (c), omit subpoint (ii) and the “or” before it;
(b) in point (d), omit subpoint (iii);
(c) in point (e)—
(i) omit subpoint (i);
(ii) in subpoint (v), omit “and (2)”.
(5) Omit paragraphs 7 and 8.

---
Source: https://www.legislation.gov.uk/uksi/2019/533/schedule/2/paragraph/21 (the official version)
Page: https://openlegislation.uk/electricity-network-codes-and-guidelines-system-operation-and-connection-amendment-etc-eu-exit-regulations-2019/schedule-2/paragraph-21
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

