Explanatory note

Original text. Later amendments are not shown.

(This note is not part of the Order)

This Order imposes on public electricity suppliers in England and Wales an obligation to make arrangements to secure the availability during specified periods of specified aggregate amounts of generating capacity from non-fossil fuel generating stations.The arrangements must be made, and evidence of their making must be produced to the Director General of Electricity Supply, before 30th September 1990.

Article 2 requires that the capacity come from non-fossil fuel generating stations other than nuclear stations.

Article 3 imposes the obligation; and introduces Schedule 1 in which is set out a Table specifying, in relation to each public electricity supplier, the periods and amounts of capacity whose availability is to be secured. The amounts are specified in megawatts (one megawatt equals one million watts).

Article 4 provides a mechanism whereby, if certain conditions are not satisfied (see Schedule 2) or if certain events occur (see Schedule 3), the Order is to have effect as if the relevant period specified in the Table in Schedule 1 were replaced by a different period and, as a consequence of that, as if the relevant amount of capacity specified in that Table were a reduced amount, the amount of the reduction being the amount of capacity which has ceased to be available by reason of (as the case may be) the condition not having been satisfied or the event having occurred.