OpenLegislation

Paragraph 3

Original text. Later amendments are not shown.

In this Order—

  • “declared net capacity”, in the case of a wind generating station, means the declared net capacity ascertained by the application to such a station of the formula specified in subsection (8A) of section 32 of the Actf1;

  • “wind generating stations” means generating stations which are driven by wind;

  • “wind generating stations exceeding 0.768 MW” means wind generating stations each of which has a declared net capacity exceeding 0.768 megawatts; and

  • “wind generating stations not exceeding 0.768 MW” means wind generating stations each of which has a declared net capacity not exceeding 0.768 megawatts.

Annotations

Footnotes

f1

Subsection (8A) was inserted by regulation 2 of the Electricity Act 1989 (Modifications of Section 32(5) to (8)) Regulations 1990 (S.I. 1990/264).