# Electricity (Non-Fossil Fuel Sources) Order (Northern Ireland) 1996, Schedule 1: Specified aggregate amounts of generating capacity


Description
Period
Generating
Stations driven or fuelled by Wind
1
2
3
4
5
6
7
8
9
(a) Period 1 means 31st March 1997 to 31st March 1998.
Period 2 means 31st March 1998 to 31st March 1999.
Period 3 means 31st March 1999 to 31st March 2000.
Period 4 means 31st March 2000 to 31st March 2001.
Period 5 means 31st March 2001 to 31st March 2005.
Period 6 means 31st March 2005 to 31st March 2011.
Period 7 means 31st March 2011 to 31st March 2012.
Period 8 means 31st March 2012 to 31st March 2013.
Period 9 means 31st March 2013 to 31st March 2015.
(b) Amounts of generating capacity are expressed in megawatts (MW).
0.426
2.567
2.567
2.567
2.567
2.567
2.141
—
—
Biomass not exceeding 500 kW
—
0.304
0.304
0.304
0.304
0.304
0.304
—
—
Municipal and Industrial Waste
—
—
—
—
6.650
6.650
6.650
6.650
6.650
Landfill Gas
1.700
1.700
2.647
5.497
6.249
3.399
1.699
1.699
—
Biogas
0.250
0.250
0.250
0.250
0.250
0.250
—
—
—
Hydro
0.075
0.251
0.251
0.251
0.251
0.251
0.176
—
—

---
Source: https://www.legislation.gov.uk/nisr/1996/407/schedule/1 (the official version)