Article 2 Requirement to make arrangements etc.
Each public ele ctricity supplier in Scotland shall, before 20th January 1995, make (in so far as he has not already done so) and produce to the Director evidence showing that he has made such arrangements as will secure that for each period shown in the Tables A to D in Schedule 1 to this Order the aggregate amount of generating capacity available to him from non-fossil fuel generating stations of the description specified in the heading to each particular Table and falling within the description of non-fossil fuel generating station specified in paragraph (2) of this article, will be not less than the amount specified in that Table in relation to him for that period.
The description of non-fossil fuel generating station specified in this paragraph is a non-fossil fuel generating station—
in respect of which the commissioning process was not satisfactorily completed before 22nd July 1993;
which has a declared net capacity not exceeding—
in the case of a station of the description specified in the heading to Table A in Schedule 1 to this Order, 645 megawatts; and
in the case of a station of the description specified in the heading to any of Tables B to D in Schedule 1, 15 megawatts; and
in respect of which there is not and has not been a premium price arrangement (other than a relevant arrangement) under which any payment has been or may be made in respect of electricity generated before 1st January 1999 by such station.