Paragraph 4 Particulars relating to the events
(a)
Total number of events, if any, during the reporting period classified as specified in sub-paragraph (b) and involving deliberate or accidental contact, damage or interference by each of the following—
(i)
a supplier, a telecommunication code system operator, a public gas supplier, a water or sewage authority, a local or highway authority, or their respective contractors;
(ii)
farmers, farm workers or farm implements;
(iii)
private individuals;
(iv)
other persons;
(v)
other causes, e.g. corrosion, ground subsidence, faulty manufacture, ageing or deterioration.
(b)
The classes referred to in sub-paragraph (a) are—
(i)
low voltage service lines;
(ii)
low voltage distributing mains;
(iii)
high voltage lines (specifying voltage).