Article 5 Rates of payment under agreement
In article 6 of the principal Order—
in sub-paragraph (1)(b), for the amount “£38”, there shall be substituted the amount “£45”;
in paragraph (2)—
the words “or in Schedule 3” shall be deleted;
in the table, in the right hand column—
for the figure “210”, there shall be substituted the figure “200”;
for the figure “80”, there shall be substituted the figure “70”;
in the table—
in the left hand column, the words “Schedule 3” shall be deleted;
in the right hand column, in the corresponding line, the figure “25” shall be deleted;
in paragraph (3), for the amount “£3”, there shall be substituted the amount “£3.50”;
after paragraph (3), there shall be inserted the following paragraph:
“(3A)Where an agreement includes a requirement to add top-wiring to specified walls, the Minister shall also make payments at a rate of £1 per metre of wall to which top-wire has been added.”;
for paragraph (4), there shall be substituted the following paragraph:
“(4)Where an agreement includes a conservation plan, the Minister shall also make payments in respect of the operations included in the plan, subject to a maximum of £20,000 for each agreement.”.