# The Environmentally Sensitive Areas (North Peak) Designation (Amendment) Order 1995, Article 5: Rates of payment under agreement


In article 6 of the principal Order—
(1) in paragraph (1)—
(a) in sub-paragraph (a), for the amount “£10”, there shall be substituted the amount “£15”;
(b) in sub-paragraph (b), for the amount “£30”, there shall be substituted the amount “£40”;
(c) for the amount “£6”, there shall be substituted the amount “£7”;
(2) after paragraph (1A), there shall be inserted the following paragraph:
“(1B) Where an agreement includes a requirement to add top-wiring to specified walls, the Minister shall also make payments at a rate of £1 per metre of wall to which top-wire has been added.;”
(3) in paragraph (2)—
(a) the words “or in Schedule 3” shall be deleted;
(b) in the table, in the right hand column—
(i) for the figure “80”, there shall be substituted the figure “85”;
(ii) for the figure “40”, there shall be substituted the figure “43”;
(c) in the table—
(i) in the left hand column, the words “Schedule 3” shall be deleted;
(ii) in the right hand column, on the corresponding line, the figure “25” shall be deleted;
(4) for paragraph (3), there shall be substituted the following paragraph:
“(3) Where an agreement includes a conservation plan, the Minister shall also make payments in respect of the operations included in the plan, subject to a maximum of £20,000 for each agreement..”

---
Source: https://www.legislation.gov.uk/uksi/1995/189/article/5 (the official version)
Page: https://openlegislation.uk/environmentally-sensitive-areas-north-peak-designation-amendment-order-1995/article-5
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

