Schedule THE SCHEDULE TO THE SCHEME PLANS AND SPECIFICATIONS OF THE CHELMER VIADUCT
The Chelmer Viaduct is to be located at the site of the remains of the old railway viaduct over the River Chelmer 600 metres upstream and west of Fullbridge (A414).
The substructure is to be constructed in concrete and clad in brickwork while the deck is to be constructed in steel and concrete surmounted with an aluminium parapet as shown on drawing Nos B939/S11 and B939/S12.
The bridge is to be 13.3 metres wide overall carrying a single 7.3 metres wide carriageway and two hardened verges. There are to be three spans, one of 42.5 metres across the River Chelmer and two additional side spans each of 25.5 metres. The headway above Mean High Water Ordinary Spring Tide level is to be 4.5 metres at the centre and 3.5 metres at the edge of the opening. This is considerably more than the 1.1 metres available at Fullbridge downstream. The width of the navigable opening will be 39 metres which is substantially larger than the 23 metres width presently available at this location.