Schedule THE SCHEDULE TO THE SCHEME PLANS AND SPECIFICATION OF THE WHITELADIES CANAL BRIDGE
The Whiteladies Canal Bridge is to be located at the site of an old steel girder bridge over the Chelmer and Blackwater Navigation 400 metres north of the crossing of the River Chelmer at Fullbridge (A414).
The substructure is to be constructed in concrete and clad in brickwork while the deck is to be constructed in steel and concrete and surmounted with an aluminium parapet as shown on drawing Nos B943/S11 and B943/S12.
The bridge is to be 14.3 metres wide overall carrying a single 7.3 metres wide carriageway and two hardened verges. There are to be two spans, one of 23.5 metres across the Chelmer and Blackwater Navigation and one side span of 12.0 metres. The headway is to be 2.2 metres above normal water level which is more than the 2.134 metres required by the Chelmer and Blackwater Navigation Ltd. The width of the canal will be increased from 11 metres to 12 metres.