# The Essex County Council (Mayrose Bridge) Scheme 1999 Confirmation Instrument 2000, Schedule THE: HIGHWAYS ACT 1980 THE ESSEX COUNTY COUNCIL (MAYROSE BRIDGE) SCHEME 1999


The Essex County Council (hereinafter referred to as “the Council”) makes this Scheme in exercise of their powers under section 106(3) of the Highways Act 1980 and of all other powers enabling them in that behalf:—
1 The Council are authorised to construct over the navigable waters of the River Crouch in the Parish of Rettendon in the Borough of Chelmsford and in the District of Basildon in the said County of Essex the bridge specified in the Schedule to this Scheme as part of the highway which they are proposing to construct between junctions with the A130 at the Rettendon Turnpike Roundabout and with the A130 to the south of the A127 Southend Arterial road.
2 This Scheme may be cited as the Essex County Council (Mayrose Bridge) Scheme 1999.

---
Source: https://www.legislation.gov.uk/uksi/2000/2707/schedule (the official version)
Page: https://openlegislation.uk/essex-county-council-mayrose-bridge-scheme-1999-confirmation-instrument-2000/schedule
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.