Division B Sampling level and frequency
United Kingdom
The number of samples to be taken each year must at least equal to 10 per 300 tonnes of the annual production for the first 3 000 tonnes of production and one sample for each additional 300 tonnes.
The following breakdown must be respected:
Group B 1 and Group B 2 (c): 50 % of the total number of samples,
Group B 3 (a), (b) and (c): 40 % of the total number of samples.
The balance (10 %) must be allocated according to the experience of the F1competent authority. In particular, consideration could be given to mycotoxins.
Annotations
Textual amendments
- F1
Words in Annex Ch. 4 substituted (16.11.2022) by The Animals, Food, Plant Health, Plant Propagating Material and Seeds (Miscellaneous Amendments etc.) Regulations 2022 (S.I. 2022/1090), regs. 1(1), 4(4)(d)