# Commission Decision of 30 May 2002 concerning the technical specification for interoperability relating to the control-command and signalling subsystem of the trans-European high-speed rail system referred to in Article 6(1) of Council Directive 96/48/EC (notified under document number C(2002) 1947) (Text with EEA relevance) (2002/731/EC), Division 6.1.2.2: Definition of assessment procedures

Extent: E+W+S+N.I.

The assessment procedures are defined in Annex E to this TSI.
The module D may only be chosen where the manufacturer operates a quality system for production, final product inspection and testing, approved and surveyed by a notified body.
The module H2 may only be chosen where the manufacturer operates a quality system for design, production, final product inspection and testing, approved and surveyed by a notified body.

---
Source: https://www.legislation.gov.uk/eudn/2002/731/annex/division/6/division/6.1/division/6.1.2/division/6.1.2.2 (the official version)
Page: https://openlegislation.uk/eu-decision-2002-731/annex/division-6/division-6.1/division-6.1.2/division-6.1.2.2
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

