# Commission Decision of 30 May 2002 concerning the technical specification for interoperability relating to the control-command and signalling subsystem of the trans-European high-speed rail system referred to in Article 6(1) of Council Directive 96/48/EC (notified under document number C(2002) 1947) (Text with EEA relevance) (2002/731/EC), Division: Assessment procedures (modules)

Extent: E+W+S+N.I.

When requested by the adjudicating entity or its authorised representative established within the Community, the notified body undertakes the EC verification in accordance with Article 18(1) and Annex VI to Directive 96/48/EC and in accordance with the provisions of the relevant modules as specified in Annex E to this TSI.
Assessment procedures for the EC verification of the trackside and on-board assemblies of the control-command subsystem, list of specifications and descriptions of the testing procedures are indicated in Tables 6.1 and 6.2 of this TSI.
As far as specified in this TSI, the EC verification of the trackside and on-board assemblies of the control-command subsystem shall take account of its interfaces with other subsystems of the trans-European high-speed rail system.
The adjudicating entity shall draw up the EC declaration of verification for the trackside and on-board assemblies of the control-command subsystem in accordance with Article 18(1) of and Annex V to Directive 96/48/EC.
The independent assessment in the safety acceptance and approval process as described in Annex A, index 1, may be accepted by the notified body, without it being repeated.

---
Source: https://www.legislation.gov.uk/eudn/2002/731/annex/division/6/division/6.2/division/2 (the official version)
Page: https://openlegislation.uk/eu-decision-2002-731/annex/division-6/division-6.2/division-2
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

