# Commission Decision of 30 May 2002 concerning the technical specification for interoperability relating to the control-command and signalling subsystem of the trans-European high-speed rail system referred to in Article 6(1) of Council Directive 96/48/EC (notified under document number C(2002) 1947) (Text with EEA relevance) (2002/731/EC), Division 6.2.1: APPLICATION OF MODULES

Extent: E+W+S+N.I.

The adjudicating entity or its authorised representative established within the Community may choose for the verification procedure of the on-board assembly of the control-command subsystem either:
the type-examination procedure (module SB) indicated in Annex E to this TSI for the design and development phase in combination with either the production quality assurance procedure (module SD) indicated in Annex E to this TSI for the production phase or the product verification procedure (module SF) indicated in Annex E to this TSI, or
the full quality assurance with design examination procedure (module SH2) indicated in Annex E to this TSI.
For the verification procedure of the trackside assembly of the control-command subsystem, the adjudicating entity or its authorised representative established within the Community may choose either:
the unit verification procedure (module SG) indicated in Annex E to this TSI, or
the type-examination procedure (module SB) indicated in Annex E to this TSI for the design and development phase in combination with either the production quality assurance procedure (module SD) indicated in Annex E to this TSI for the production phase or the product verification procedure (module SF) indicated in Annex E to this TSI, or
the full quality assurance with design examination procedure (module SH2) indicated in Annex E to this TSI.
The module SH2 may be chosen only where all activities contributing to the subsystem project to be verified (design, manufacturing, assembling, installation) are subject to a quality system for design, production, final product inspection and testing, approved and surveyed by a notified body.
Table 6.1
Control-command verification requirements for on-board assembly
1
2
2a
3
4
5
Number
Description
Remarks
CC interfaces
Interfacing TSI subsystems
Characteristics to be assessed by reference to Annex A unless otherwise specified
1
Vigilance supervision
Internal as a function in on-board control-command or external in RS subsystem
If vigilance supervision is external, then optional interface to ERTMS/ETCS on-board may exist
Rolling stock (brakes)
0, 1, 2, 3, 4a, 10
2
Train integrity supervision
In the case, where the train is configured for level 3, the train integrity supervision function must be supported via detection equipment rolling stock-side
ERTMS/ETCS on-board
Rolling stock
0, 1, 2, 3, 4a, 5, 17
3
Train detection
Requirements on rolling stock, because of e.g. track circuits and axle counters
Rolling stock (train detection characteristics)
4b, 16
4
Key management
Security policy for key management
(a) ERTMS/ETCS trackside
(b) ERTMS/ETCS on-board
15
5
Design, integration and validation of the assembly
1.. Engineering rules
2.. Functional integration test
Tests to confirm correct functional operation of inter-working of a new combination of interoperability constituents
Tests in the real configuration
The notified body shall verify that the integration test requirements (issued by the Member State) for Annex B systems have been met
The test includes the ability of the down-loading tool to read and display the safety data recorded
Includes absence of unsafe interaction between interoperability constituents (possibly due to national add-ons)
3.. The notified body shall insure the completeness of the safety approval process including safety case
All those implemented
Rolling stock
All those implemented
34
32
+
integration test requirements for a specific Annex B system must be available in public domain when that system is put on the market for integration into an on-board assembly.
1, 2
Table 6.2
Control-command verification requirements for trackside assembly
1
2
2a
3
4
5
Number
Description
Remarks
CC interfaces
Interfacing TSI subsystems
Characteristics to be assessed by reference to Annex A unless otherwise specified
1
ERTMS/GSM-R trackside
(a) ERTMS/GSM-R on-board
(b) ERTMS/ETCS trackside
0, 12c, 14a,
2
Train detection, including interference requirements from conducted interference
Trackside requirements:
1.. lines with unknown detection/interference characteristics cannot receive a derogation,
2.. they must be upgraded before they can be declared interoperable,
3.. a notified body shall verify that nominated trains meet the requirements of a derogation
Rolling stock (train detection characteristics)
4b, 16
3
Key management
Security policy for key management
ERTMS/ETCS trackside
ERTMS/ETCS on-board
15
4
Design, integration and validation of the assembly
1.. Engineering rules
2.. Functional integration test
Tests to confirm correct functional operation of interworking of a new combination of interoperability constituents
Tests in the real configuration
The notified body shall verify that the integration test requirements (issued by the Member State) for Annex B systems have been met
Includes absence of unsafe interaction between interoperability constituents (possibly due to national add-ons)
3.. The notified body shall insure the completeness of the safety approval process including safety case.
All those implemented
All those implemented
34
33
1, 2

---
Source: https://www.legislation.gov.uk/eudn/2002/731/annex/division/6/division/6.2/division/6.2.1 (the official version)