# Commission Decision of 30 May 2002 concerning the technical specification for interoperability relating to the rolling stock subsystem of the trans-European high-speed rail system referred to in Article 6(1) of Directive 96/48/EC (notified under document number C(2002) 1952) (Text with EEA relevance) (2002/735/EC), Division 6.1.2.3: Definition of assessment procedures

Extent: E+W+S+N.I.

The assessment procedures are defined in Annex F to this TSI.
Module D may only be chosen where the manufacturer operates a quality system for production, final product inspection and testing, approved and surveyed by a notified body.
Module H2 may only be chosen where the manufacturer operates a quality system for design, production, final product inspection and testing, approved and surveyed by a notified body.
The conformity and suitability for use assessment shall cover the phases and characteristics as indicated by X in the Table 1 of Annex D to this TSI.

---
Source: https://www.legislation.gov.uk/eudn/2002/735/annex/division/6/division/6.1/division/6.1.2/division/6.1.2.3 (the official version)
Page: https://openlegislation.uk/eu-decision-2002-735/annex/division-6/division-6.1/division-6.1.2/division-6.1.2.3
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

