{
  "url": "https://openlegislation.uk/eu-decision-2002-735/annex/division-6/division-6.2/division-6.2.2",
  "json_url": "https://openlegislation.uk/eu-decision-2002-735/annex/division-6/division-6.2/division-6.2.2.json",
  "legislation": "eudn/2002/735",
  "legislation_title": "Commission Decision of 30 May 2002 concerning the technical specification for interoperability relating to the rolling stock subsystem of the trans-European high-speed rail system referred to in Article 6(1) of Directive 96/48/EC (notified under document number C(2002) 1952) (Text with EEA relevance) (2002/735/EC)",
  "legislation_url": "https://openlegislation.uk/eu-decision-2002-735",
  "path": "annex/division/6/division/6.2/division/6.2.2",
  "kind": "division",
  "number": "6.2.2",
  "heading": "Application of modules",
  "text": "For the verification procedure of the rolling stock subsystem the adjudicating entity or its authorised representative established within the Community may choose either:\nthe type-examination procedure (module SB) indicated in Annex F to this TSI for the design and development phase in combination with:\neither the production quality assurance procedure (module SD) indicated in Annex F to this TSI,\nor the product verification procedure (module SF) indicated in Annex F to this TSI for the production phase,\nor alternatively\nthe full quality assurance with design examination procedure (module SH2) indicated in Annex F to this TSI for all phases.\nThe SH2 module may be chosen only where all activities contributing to the rolling stock subsystem project to be verified (design, manufacturing, assembling, installation) are subject to a quality system for design, production, final product inspection and testing, approved and surveyed by a notified body.\nThe SD module may be chosen only where all activities contributing to the rolling stock subsystem project to be verified (manufacturing, assembling, installation) are subject to a quality system for production, final product inspection and testing, approved and surveyed by a notified body.\nIf these two above conditions are not fulfilled, the SB module in combination with the SF module is to be applied.\nThe assessment shall cover the phases and characteristics as indicated in Table 2, of Annex E to this TSI.",
  "extent": "E+W+S+N.I.",
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/eudn/2002/735/annex/division/6/division/6.2/division/6.2.2",
    "retrieved_at": "2026-11-01T15:18:29.829862+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}