Division Sampling
United Kingdom
For the sampling of waste - for basic characterisation, compliance testing and on-site verification testing - a sampling plan shall be developed according to part 1 of the sampling standard currently developed by CEN.
Notes on Division 3
Textual amendments
- F1
Words in Annex section 3 substituted (31.12.2020) by The Waste (Miscellaneous Amendments) (EU Exit) Regulations 2019 (S.I. 2019/620), regs. 1(2)(b), 15(7)(e)(i); 2020 c. 1, Sch. 5 para. 1(1)
- F2
Words in Annex section 3 substituted (31.12.2020) by The Waste (Miscellaneous Amendments) (EU Exit) Regulations 2019 (S.I. 2019/620), regs. 1(2)(b), 15(7)(e)(ii); 2020 c. 1, Sch. 5 para. 1(1)