Division (5)
United Kingdom
The present case concerns a concentration by which EDP and ENI (the parties) plan to acquire joint control over GDP. The operation foresees that the gas transmission network (i.e. excluding Sines LNG terminal, import pipeline and Carriço underground storage) will be transferred to REN, the Portuguese electricity grid operator within a given timeframe. During a transitory period, EDP will have control over the gas network, along with ENI and REN.