Appendix Annex (i) to Draft Annual Programme 2005
United Kingdom
In view of the responsibility of the Member State to manage projects supported by the ERF in accordance with Article 12(2)(c) of Decision 2004/904/EC. Please describe the implementing system put in place in order to (a) ensure co-ordination and consistency of actions, (b) select projects and ensure that the selection procedure is transparent and (c) manage, monitor, check, evaluate and audit projects.
The implementing system shall respect the implementing rules adopted by the Commission according to Article 13(5) of Decision 2004/904/EC.
For your description of the implementing system, please make use of the questionnaire attached. Please submit this questionnaire together with the proposal for the 2005 annual programme.
Please note that an updated description of management and control systems should be provided to the Commission whenever substantial changes are made to the systems and procedures.
Date:
1.
ACTION FRAMEWORK
1.1.
Legal framework
(Indicate the legislation and national rules applicable to management and control procedures for ERF actions).
National legislation applicable to ERF management
…
…
…
…
…
…
Specific national rules adopted for ERF management
…
…
…
…
…
1.2.
Responsible authority and delegated body
The responsible authority within the meaning of Article 13 of Decision 2004/904/EC
(Attach the official document designating the public body in question as the ‘responsible authority’ for managing the ERF).
Name: …
Address: …
Name of person responsible: …
Contact person: …
Function of contact person: …
Tel.: …
Fax: …
E-mail: …
Delegated body within the meaning of Article 13 of Decision 2004/904/EC (where appropriate)
(Attach the official document whereby the responsible authority delegated responsibility for implementing ERF actions to the intermediary).
Name: …
Address: …
Name of person responsible: …
Contact person: …
Function of contact person: …
Tel.: …
Fax: …
E-mail: …
2.
STRUCTURE AND RESOURCES OF THE RESPONSIBLE AUTHORITY/DELEGATED BODY
Attach a detailed organisation chart including a brief description of functions. If implementation of the ERF has been delegated, attach an organisation chart and a brief description of functions for the delegated body.
2.1.
Status of the responsible authority/delegated body
What is the legal status of the responsible authority?
| | Public body | | Public law establishment or agency |
What is the legal status of the delegated body?
| | Public body | | Public law establishment or agency |
| | Private body | | Other (please specify) … |
2.2.
Staff list
Responsible authority (key members of staff involved in managing ERF funds)
| Function | Name | Status |
|---|---|---|
Delegated body (where appropriate)
| Function | Name | Status |
|---|---|---|
2.3.
Use of external bodies
(Please specify whether the responsible authority/intermediary uses external bodies to carry out one or more tasks entrusted to it and, where applicable, specify the arrangements made for that purpose).
…
…
…
…
3.
DESCRIPTION OF DUTIES INHERENT IN MANAGEMENT AND CONTROL SYSTEMS
3.1.
Distribution of tasks
| Indicate external consultants where applicable. | |
| NB: Verifications to be performed by the responsible authority or under its responsibility (external auditors, public bodies) for control purposes (Article 25(a)), i.e. not directly linked to the monitoring of day-to-day project management (analysis and decision, payment applications), etc. | |
| Tasks | Units/Departments/persons responsible |
|---|---|
| Preparation of the national multi-annual and annual programme | |
| Publication of calls for proposals (grants) | |
| Receipt and registration of proposals | |
| Administrative analysis of proposals (eligibility) | |
| Financial analysis of proposals | |
| Evaluation of proposals | |
| Technical analysis of proposals | |
| Selection of proposals (decision) | |
| Notification of decisions to grant applicants | |
| Preparation of related grant agreements | |
| Signing of grant agreements | |
| Monitoring of project implementation | |
| Receipt of payment applications/invoices | |
| Analysis of recipients’ payment applications/invoices | |
| Authorisation of payments | |
| Checks on projectsf1 | |
| Payment function | |
| Preparation and publication of Call for Tender | |
| Receipt and registration of tender offers | |
| Administrative analysis of tenders | |
| Financial analysis of tenders | |
| Technical analysis of tenders | |
| Tender Award Procedure | |
| Signing of contracts | |
| Drafting annual implementation report | |
| Drafting of expenditure statements by the Member State sent to the European Commission | |
| Drafting of payment applications by the Member State sent to the European Commission | |
| Sending of payment applications from the Member State to the European Commission | |
| Audit of management systemsf2 | |
| Evaluation | |
3.2.
Segregation of duties
(If management, payment and control duties are carried out within the same unit (department), please specify how these activities are clearly segregated).
…
…
…
…
…
…
…
Entry of ERF revenue and expenditure in the accounts
3.2.1.
Accounting arrangements
What accounting instrument is used to record ERF appropriations?
| | Specific budget line in the national budget | | Non-budget item |
| | Specific special bank account | | Other (please specify) … |
3.2.2.
Description of the circuit whereby funds are made available and sent from the account in the Member State into which they are paid to the specific account of the final recipient
| Levels | Account name | Person responsible | |
|---|---|---|---|
| Arrival of funds paid by the EC | |||
| Final recipient |
Is the authorisation circuit for ERF payments similar to that for payments made under the national budget?
| | Yes | | No |
If not, please describe the differences, stating the underlying reasons:
…
…
…
…
…
…
3.2.3.
Description of the rules (if in use) for carrying over ERF appropriations and national co-financing appropriations where public funds are involved
…
…
…
…
…
…
…
…
4.
ANALYSIS OF THE MANAGEMENT PROCESS — DESCRIPTION OF CIRCUITS AND PROCEDURES
4.1.
Preparation of the multi-annual and annual programme
Who prepares the multi-annual and annual programme to be submitted to the Commission?
…
…
…
…
In particular, how are the financial plans included in these programmes?
…
…
…
…
…
…
Do these preparations entail contacts with appropriate partners to establish the multi-annual work programme or with potential recipients prior to establishing the annual programme, (call for expression of interest, call for proposals, tender procedures?
…
…
…
…
4.2.
Calls for proposals and selection of proposals/tender procedures
Have documents (manuals, circulars, guides to procedures) laying down the procedures described below been adopted by the responsible authority/delegated body?
| Yes | | No | |
4.2.1.
Establishment of calls for proposals/Call for Tender
-
Preparation and validation of the calls for proposals/Call for Tender
Is provision made for this?Y/N/NA Entity/Department responsible Form of procedure (manual, circular, guide to procedures, checklists, etc.) Documents to be attached 2005 call for proposals (including application forms); Call for Tenders -
Who is consulted before the calls for proposals/Call for Tender are finalised?
Other departments Other national authorities European Commission Other (please specify) …
4.2.2.
Publication of call for proposals/Call for Tender
| Is provision made for this?Y/N/NA | Entity/Department responsible | Form of procedure (manual, circular, guide to procedures, checklists, etc.) |
|---|---|---|
| — | Publication arrangements: | ||
| — | National Official Journal and the Official Journal of EC (if required under procurement procedure) | | |
| — | specific internet sites | | |
| — | general press | | |
| — | specialist press | | |
| — | brochures and folders | | |
| — | Other | (please specify) … | |
4.2.3.
Assistance for applicants in preparing proposals/tenders (i.e. documents or services explaining calls for proposals/tenders, such as guides for applicants, etc.)
| Is provision made for this?Y/N/NA | Entity/Department responsible | Form of procedure (manual, circular, guide to procedures, checklists, etc.) | Documents to be attached |
|---|---|---|---|
| Existing documents or drafts |
4.2.4.
Receipt and registration of proposals/Tender Documents
| Is provision made for this?Y/N/NA | Entity/Department responsible | Form of procedure (manual, circular, guide to procedures, checklists, etc.) |
|---|---|---|
-
Receipt of the proposal/Tender is confirmed by:
— acknowledgement of receipt — letter/fax/e-mail — other (please specify) … — no confirmation -
Verification of compliance with dispatch/receipt dates and that proposals/tender documents received are complete:
Is provision made for this?Y/N/NA Entity/Department responsible Form of procedure (manual, circular, guide to procedures, checklists, etc.)
4.2.5.
Analysis of proposals/Tender documents
- (a)
Administrative analysis
(information on applicants, checks on eligibility criteria, etc.)
Is provision made for this?Y/N/NA Entity/Department responsible Form of procedure (manual, circular, guide to procedures, checklists, etc.) - (b)
Technical analysis
(analysis in the light of the selection and award criteria as defined in the call for proposals/Tender specifications)
Is provision made for this?Y/N/NA Entity/Department responsible Form of procedure (manual, circular, guide to procedures, checklists, etc.) Have precise selection and award criteria been defined?
Yes No If so, are they set out in a document (analytical checklist, etc.)?
Yes No - (c)
Financial analysis
Is provision made for this?Y/N/NA Entity/Department responsible Form of procedure (manual, circular, guide to procedures, checklists, etc.) Have precise criteria been defined (reference values/ceilings per type of expenditure)?
Yes No If yes, are they set out in a document (checklist, etc.)?
Yes No
4.2.6.
Relation with other Community initiatives or programmes
Are checks carried out for any possible overlap with actions/projects funded in your Member State within the framework of other Community initiatives or programmes, for example EQUAL?
| Is provision made for this?Y/N/NA | Entity/Department responsible | Form of procedure (manual, circular, guide to procedures, checklists, etc.) |
|---|---|---|
4.2.7.
Evaluation and selection of proposals/Tender Award Procedures
| Is provision made for this?Y/N/NA | Entity/Department responsible | Form of procedure (manual, circular, guide to procedures, checklists, etc.) |
|---|---|---|
(Describe the parties involved (internal evaluation, external assessors, evaluation committees) in assessing proposals/tenders submitted).
…
…
…
…
…
4.2.8.
Decision to select/reject proposals/tenders
Who is officially responsible for deciding whether to select or reject proposals?
| Is provision made for this?Y/N/NA | Entity/Department responsible | Form of procedure (manual, circular, guide to procedures, checklists, etc.) |
|---|---|---|
4.2.9.
Notification of decisions to reject proposals/tenders
| Is provision made for this?Y/N/NA | Entity/Department responsible | Form of procedure (manual, circular, guide to procedures, checklists, etc.) |
|---|---|---|
Is a letter indicating the grounds for rejection sent to the applicant/tenderer?
| Yes | | No | |
Does the letter indicate the grounds for rejection?
| Yes | | No | |
4.2.10.
Acceptance of the project/funding decision/award of tender
Accounting arrangements for selected projects
| Is provision made for this?Y/N/NA | Entity/Department responsible | Form of procedure (manual, circular, guide to procedures, checklists, etc.) |
|---|---|---|
Who signs the funding agreement/tender award decision on behalf of the responsible authority/delegated body?
(attach a copy of a model agreement and specimen reports sent to recipients)
| Is provision made for this?Y/N/NA | Entity/Department responsible | Form of procedure (manual, circular, guide to procedures, checklists, etc.) | Documents to be attached |
|---|---|---|---|
| Specimen funding agreement(s) |
4.3.
Management and payment of grant
4.3.1.
Payment arrangements as defined in the funding agreement(s) with the recipient
| Payment | Amount(% of total) | Payment condition(reports to be presented by recipients) | Scheduled date(in relation to project completion) |
|---|---|---|---|
| First pre-financement | |||
| Second pre-financing | |||
| Balance |
Have specimen progress reports and final assessment reports for use by recipients been drawn-up? (attach specimen progress reports and assessment reports)
| Yes | | No | |
Have specimen financial reports/payment applications for use by recipients been drawn-up? (attach specimen financial reports and payment applications)
| Yes | | No | |
4.3.2.
Monitoring of project implementation
| Is provision made for this?Y/N/NA | Entity/Department responsible | Form of procedure (manual, circular, guide to procedures, checklists, etc.) |
|---|---|---|
Does this monitoring include on-the-spot project inspection visits?
| Yes | | No | |
If yes, what arrangements apply (frequency, checks on project activities/financial aspects, etc.)?
…
…
…
…
4.3.3.
Receipt and analysis of payment applications submitted by projects
| Is provision made for this?Y/N/NA | Entity/Department responsible | Form of procedure (manual, circular, guide to procedures, checklists, etc.) |
|---|---|---|
Does the analysis of payment applications include the following checks:
| First pre-financement(Y/N) | Second pre-financement(Y/N) | Final(Y/N) | |
|---|---|---|---|
| Whether the amount applied for tallies with the amount specified in the agreement | |||
| Whether the applicant is the correct person and whether the bank account to which the funding is to be paid is valid | |||
| Whether the project has been completed in accordance with the provisions of the funding agreement | |||
| Exhaustive, detailed list of project expenditure | |||
| Checking of calculations in the recipient’s expenditure statement | |||
| Whether declared expenditure tallies with the budget forecast | |||
| Supporting evidence for declared expenditure | |||
| Percentage of declared expenditure checked against supporting evidence: … % | |||
| Certification of expenditure by an external body (accountant, auditor, etc.) | |||
| Whether declared expenditure complies with the rules laid down in Commission Decision … |
4.3.4.
Initiating payment/recovery from beneficiaries
| Is provision made for this?Y/N/NA | Entity/Department responsible | Form of procedure (manual, circular, guide to procedures, checklists, etc.) |
|---|---|---|
4.3.5.
Payment/recovery order
| Is provision made for this?Y/N/NA | Entity/Department responsible | Form of procedure (manual, circular, guide to procedures, checklists, etc.) |
|---|---|---|
4.3.6.
Implementation of payment/recovery
| Is provision made for this?Y/N/NA | Entity/Department responsible | Form of procedure (manual, circular, guide to procedures, checklists, etc.) |
|---|---|---|
Does implementation of payment/recovery include the following checks:
| First pre-financement Advance(Y/N) | Second pre-financement Interim(Y/N) | Final(Y/N) | |
|---|---|---|---|
| Existence of a valid legal commitment for the project (funding agreement) | |||
| Valid payment/recovery order authorisation (checklist) | |||
| Payment/recovery order duly signed by the authorised signatory | |||
| Recipient’s exact legal status and banking data | |||
| Correct accounting entry for the payment/recovery demand |
4.3.7.
Means of payment
How are recipients paid?
| Bank transfer | | Cheque | | Other | |
4.3.8.
Monitoring of recovery
(What arrangements are made to monitor, and ensure repayment of, recovery orders issued in respect of projects?)
…
…
…
…
…
…
…
…
4.3.9.
Reallocation procedures for funds repaid within the framework of the ERF (where appropriate)
…
…
…
…
…
…
…
…
4.4.
Expenditure statements and payment applications from the Member State
4.4.1.
Expenditure statement
Which department/entity draws-up the expenditure statements sent to the European Commission
| Is provision made for this?Y/N/NA | Entity/Department responsible | Form of procedure (manual, circular, guide to procedures, checklists, etc.) |
|---|---|---|
Which authority certifies the expenditure statements sent to the European Commission
| Is provision made for this?Y/N/NA | Individual/Entity/Department responsible | Form of procedure (manual, circular, guide to procedures, checklists, etc.) |
|---|---|---|
4.4.2.
Request for payment
Which department draws-up the request for payment sent to the European Commission (Article …)
| Is provision made for this?Y/N/NA | Entity/Department responsible | Form of procedure (manual, circular, guide to procedures, checklists, etc.) |
|---|---|---|
5.
CHECKS, CONTROL AND AUDIT
5.1.
Departments responsible for project checks (as defined in Article 25(a))
| Indicate also cases where external body used to carry out checks. | ||
| Is provision made for this?Y/N/NA | Entity/Department responsiblef3 | Form of procedure (manual, circular, guide to procedures, checklists, etc.) |
|---|---|---|
5.2.
Features of project checks
| Indicators | Yes | No | |
|---|---|---|---|
| Structure of checks: | |||
| — centralised | |||
| — decentralised | |||
| — externalised | |||
| Number of persons carrying out checks | |||
| Types of checks: | |||
| Checks based on risk analysis? | |||
| — ex ante | |||
| — during project implementation | |||
| — ex post | |||
| An annual programme is drawn-up taking account of the sampling methods defined in Article 7 | |||
Do checking activities include:
| Yes | No | |
|---|---|---|
| Ensuring that project selection procedures are complied with | ||
| Checking that the project’s aims tally with the objectives set out in the ERF national implementation programme | ||
| Checking that the expenditure carried over by funding recipients tallies with the supporting documents | ||
| Checking that expenditure corresponds to Community requirements, the requirements specified during the national selection procedure, the terms of the contract or instrument granting the funding and the works actually executed | ||
| Checking that national co-financing is actually provided | ||
| Checking compliance with procedures and circuits defined by the responsible authority/intermediary as regards the analysis, authorisation and implementation of payments to recipients | ||
| Checking that the amount of funding respects the limits laid down in Article 23 of Decision 2004/904/EC | ||
| Checking that funding has actually been paid to recipients | ||
| Checking the audit trail | ||
| Checking that accepted project expenditure and revenue tallies with the amounts of expenditure and revenue declared by the responsible authority in the expenditure statements submitted to the European Commission |
5.3.
Follow-up for checks
- (a)
To whom are reports sent?
-
the recipients of checked projects
-
the responsible authority’s management board
-
the responsible authority’s internal audit department
-
the national audit authorities
-
other (please specify) …
-
- (b)
What follow-up is given to these reports:
-
in terms of the projects concerned (financial corrections, checks on other projects launched by the same recipients, etc.)
…
…
…
-
in terms of the responsible authority/intermediary (amendments and corrections to procedures/manuals of procedures, checklists, etc.)
…
…
…
…
…
-
5.4.
Audit of the responsible authority/intermediary
Is the responsible authority/intermediary subject to audit?
| Yes | | No | |
Which departments or authorities have the capacity to carry out this audit?
-
Internal audit department of the responsible authority/intermediary
-
Audit department of another body
-
National audit body (Court of Auditors)
Has an audit of that type been carried out since the entry into force of the Council Decision 2004/904/EC
| Yes | | No | |
If so:
On what date? …
By which authority? …
Is/are the report(s) available? …
What action has been taken on this report?
…
…
…
…
…
…
…
6.
AUDIT TRAIL
Where are the following documents kept?
| Documents | Unit/Department responsible | How long for? |
|---|---|---|
| National multi-annual and annual programme | ||
| European Commission decision on multi-annual and annual programme | ||
| Call for proposals/Call for tenders | ||
| Applicant files/Contract files | ||
| Administrative, technical and financial analysis of proposals received (evaluation grids) and evaluation committee reports | ||
| Funding decision or rejection | ||
| Project funding agreement | ||
| Financial commitment decisions corresponding to projects | ||
| Progress reports and final reports submitted by funding recipients | ||
| Financial reports and payment applications submitted by funded projects | ||
| Supporting documents for expenditure and revenue for funded projects | ||
| Payment/recovery authorisations for funding (checklists) | ||
| Payment/recovery orders for funding | ||
| Proof of payment/recovery of funding | ||
| Reports on checks carried out on projects | ||
| Reports on checks carried out at national level on management and control systems | ||
| Expenditure statements sent to the European Commission | ||
| Payment requests sent to the European Commission | ||
| Final implementation reports sent to the European Commission | ||
| Proof of payment received from the European Commission |
7.
EVALUATION
7.1.
Departments responsible for evaluation
| Also indicate external consultants where appropriate. | ||
| Is provision made for this?Y/N/NA | Entity/Department responsiblef4 | Form of procedure (manual, circular, guide to procedures, checklists, etc.) |
|---|---|---|
7.2.
Evaluation schedule
How often are ERF actions to be evaluated?
| | Mid-term evaluation | | Final evaluation |
7.3.
Indicators
Have indicators been established for the purpose of monitoring and evaluation of projects and of national programmes, and are they collected during the management phase?
| Yes | | No | |
Have detailed indicators been established for each type of action provided for in Articles 4, 5, 6 and 7 of Decision 2004/904/EC?
| Resources and project completion indicators(mark X if yes) | Action completion indicators(mark X if yes) | Action result indicators(mark X if yes) | Action impact indicators (consequences)(mark X if yes) | |
|---|---|---|---|---|
| 1. Reception conditions and asylum procedures | ||||
| — help for individuals | ||||
| — structural assistance | ||||
| 2. Integration | ||||
| — help for individuals | ||||
| — structural assistance | ||||
| 3. Voluntary return | ||||
| — help for individuals | ||||
| — structural assistance |
Annotations
Footnotes
- f1
-
Indicate external consultants where applicable.
- f2
-
NB: Verifications to be performed by the responsible authority or under its responsibility (external auditors, public bodies) for control purposes (Article 25(a)), i.e. not directly linked to the monitoring of day-to-day project management (analysis and decision, payment applications), etc.
- f3
-
Indicate also cases where external body used to carry out checks.
- f4
-
Also indicate external consultants where appropriate.