Division 2 Congestion management methods
United Kingdom
- 2.1Division 2.1
- 2.2Division 2.2
- 2.3Division 2.3
- 2.4Division 2.4
- 2.5Division 2.5
- 2.6TSOs shall define an appropriate structure for the allocation of capacity between different timeframes. This may include an option for reserving a minimum percentage of interconnection capacity for daily or intra-daily allocation. This allocation structure shall be subject to review by the respective Regulatory Authorities. In drawing up their proposals, the TSOs shall take into account:
- 2.7Division 2.7
- 2.8Division 2.8
- 2.9Division 2.9
- 2.10Division 2.10
- 2.11Division 2.11
- 2.12Division 2.12
- 2.13Division 2.13