# Commission Decision of 7 November 2006 concerning a technical specification for interoperability relating to the control-command and signalling subsystem of the trans-European high speed rail system and modifying Annex A to Decision 2006/679/EC concerning the technical specification for interoperability relating to the control-command and signalling subsystem of the trans-European conventional rail system (notified under document number C(2006) 5211) (Text with EEA relevance) (2006/860/EC), Division 4.5.3: Responsibility of infrastructure manager or railway undertaking

Extent: E+W+S+N.I.

The infrastructure manager or railway undertaking responsible for operating the On-board or Track-side Assembly:
Shall set up a maintenance plan as specified in section 4.5.4 (Maintenance plan).

---
Source: https://www.legislation.gov.uk/eudn/2006/860/annex/division/4/division/4.5/division/4.5.3 (the official version)
Page: https://openlegislation.uk/eu-decision-2006-860/annex/division-4/division-4.5/division-4.5.3
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

