{
  "url": "https://openlegislation.uk/eu-decision-2006-860/annex/division-4/division-4.5/division-4.5.4",
  "json_url": "https://openlegislation.uk/eu-decision-2006-860/annex/division-4/division-4.5/division-4.5.4.json",
  "legislation": "eudn/2006/860",
  "legislation_title": "Commission Decision of 7 November 2006 concerning a technical specification for interoperability relating to the control-command and signalling subsystem of the trans-European high speed rail system and modifying Annex A to Decision 2006/679/EC concerning the technical specification for interoperability relating to the control-command and signalling subsystem of the trans-European conventional rail system (notified under document number C(2006) 5211) (Text with EEA relevance) (2006/860/EC)",
  "legislation_url": "https://openlegislation.uk/eu-decision-2006-860",
  "path": "annex/division/4/division/4.5/division/4.5.4",
  "kind": "division",
  "number": "4.5.4",
  "heading": "Maintenance plan",
  "text": "The maintenance plan shall be based on the provisions specified in section 4.5.1 (Responsibility of manufacturer of equipment), section 4.5.2 (Responsibility of contracting entities) and section 4.5.3 (Responsibility of infrastructure manager or railway undertaking) and cover, at least:\nConditions for the use of equipment, according to the requirements indicated by the manufacturers.\nSpecification of the maintenance programs (e.g. definition of preventive and corrective maintenance categories, maximum time between preventive maintenance actions and corresponding precautions to be taken for the safety of the Subsystem and the maintenance staff, considering interference of maintenance actions with the operation of the Control-Command Subsystem).\nRequirements for the storage of spare parts.\nDefinition of first line maintenance.\nRules for the management of failed equipment.\nRequirements related to the minimum professional competences of maintenance staff, with reference to the risks for health and safety.\nRequirements related to personal protective equipment.\nDefinition of responsibilities and authorisation of maintenance staff (e.g., for access to equipment, management of limitations and/or interruptions of system operation, replacement of LRUs, repair of failed LRUs, restore of normal system operation).\nProcedures for the management of ETCS-identities. See section 4.2.9 (ETCS-ID Management).\nMethods for reporting to the manufacturer of equipment information on safety-critical defects and frequent system failures.",
  "extent": "E+W+S+N.I.",
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/eudn/2006/860/annex/division/4/division/4.5/division/4.5.4",
    "retrieved_at": "2026-11-01T15:17:24.266188+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}