# Commission Decision of 11 August 2006 concerning the technical specification of interoperability relating to the subsystem ‘Traffic Operation and Management’ of the trans-European conventional rail system (notified under document number C(2006) 3593) (Text with EEA relevance) (2006/920/EC) (repealed)

EU Decision 2006/920 · adopted 11 August 2006

Commission Decision of 11 August 2006 concerning the technical specification of interoperability relating to the subsystem ‘Traffic Operation and Management’ of the trans-European conventional rail system (notified under document number C(2006) 3593) (Text with EEA relevance) (2006/920/EC) (repealed)

## Introductory text

Commission Decision
of 11 August 2006
concerning the technical specification of interoperability relating to the subsystem ‘Traffic Operation and Management’ of the trans-European conventional rail system
(notified under document number C(2006) 3593)
(Text with EEA relevance)
(2006/920/EC) (repealed)
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 1 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 1a Management of technical codes

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 1b 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 2 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 3 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 5 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 6 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## Annex: TECHNICAL SPECIFICATION FOR INTEROPERABILITY

### Division TECHNICAL SPECIFICATION FOR INTEROPERABILITY: TRAFFIC OPERATION AND MANAGEMENT SUBSYSTEM

### Division 1: INTRODUCTION

## 1.1 TECHNICAL SCOPE

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 1.2 GEOGRAPHICAL SCOPE

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 2: DEFINITION OF SUBSYSTEM/SCOPE

## 2.1 SUBSYSTEM

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 2.2 SCOPE

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 2.2.1 STAFF AND TRAINS

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 2.2.2 OPERATING PRINCIPLES

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 2.2.3 APPLICABILITY TO EXISTING VEHICLES AND INFRASTRUCTURE

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 2.3 LINK BETWEEN THIS TSI AND DIRECTIVE 2004/49/EC

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 3: ESSENTIAL REQUIREMENTS

## 3.1 COMPLIANCE WITH THE ESSENTIAL REQUIREMENTS

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 3.2 ESSENTIAL REQUIREMENTS — OVERVIEW

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 3.3 SPECIFIC ASPECTS IN RELATION TO THESE REQUIREMENTS

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 3.3.1 SAFETY

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## Essential requirement 1.1.1 of Annex III to Directive 2001/16/EC:

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## Essential requirement 1.1.2 of Annex III to Directive 2001/16/EC:

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## Essential requirement 1.1.3 of Annex III to Directive 2001/16/EC:

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## Essential requirement 1.1.4 of Annex III to Directive 2001/16/EC:

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## Essential requirement 1.1.5 of Annex III to Directive 2001/16/EC:

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 3.3.2: RELIABILITY AND AVAILABILITY

## Essential requirement 1.2 of Annex III to Directive 2001/16/EC

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 3.3.3: HEALTH

## Essential requirement 1.3.1 of Annex III to Directive 2001/16/EC:

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## Essential requirement 1.3.2 of Annex III to Directive 2001/16/EC:

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 3.3.4: ENVIRONMENTAL PROTECTION

## Essential requirement 1.4.1 of Annex III to Directive 2001/16/EC:

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## Essential requirement 1.4.2 of Annex III to Directive 2001/16/EC:

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## Essential requirement 1.4.3 of Annex III to Directive 2001/16/EC:

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## Essential requirement 1.4.4 of Annex III to Directive 2001/16/EC:

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## Essential requirement 1.4.5 of Annex III to Directive 2001/16/EC:

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 3.3.5: TECHNICAL COMPATIBILITY

## Essential requirement 1.5 of Annex III to Directive 2001/16/EC

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 3.4: ASPECTS RELATING SPECIFICALLY TO THE TRAFFIC OPERATION AND MANAGEMENT SUBSYSTEM

### Division 3.4.1: SAFETY

## Essential requirement 2.6.1 of Annex III to Directive 2001/16/EC:

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 3.4.2: RELIABILITY AND AVAILABILITY

## Essential requirement 2.6.2 of Annex III to Directive 2001/16/EC:

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 3.4.3: TECHNICAL COMPATIBILITY

## Essential requirement 2.6.3 of Annex III to Directive 2001/16/EC:

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 4: CHARACTERISTICS OF THE SUB-SYSTEM

## 4.1 INTRODUCTION

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2 FUNCTIONAL AND TECHNICAL SPECIFICATIONS OF THE SUB-SYSTEM

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 4.2.1: SPECIFICATIONS RELATING TO STAFF

## 4.2.1.1 General requirements

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.1.2 Documentation for drivers

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.1.2.1 Rule Book

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.1.2.2 Description of the line and the relevant lineside equipment associated with the lines worked over

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.1.2.2.1 Preparation of the Route Book

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.1.2.2.2 Modified elements

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.1.2.2.3 Informing the driver in real time

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.1.2.3 Timetables

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.1.2.4 Rolling stock

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.1.3 Documentation for Railway Undertaking staff other than drivers

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.1.4 Documentation for Infrastructure Manager’s staff authorising train movements

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.1.5 Safety-related communications between traincrew, other Railway Undertaking staff and staff authorising train movements

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 4.2.2: SPECIFICATIONS RELATING TO TRAINS

### Division 4.2.2.1: Train visibility

## 4.2.2.1.1 General requirement

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.2.1.2 Front end

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.2.1.3 Rear end

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 4.2.2.2: Train audibility

## 4.2.2.2.1 General requirement

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.2.2.2 Control

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.2.3 Vehicle identification

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.2.4 Freight vehicle loading

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.2.4.1 Weight distribution

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.2.4.2 Axle loading

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.2.4.3 Load securing

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.2.4.4 Kinematic envelope

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.2.4.5 Load covering

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.2.5 Train composition

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 4.2.2.6: Train braking

## 4.2.2.6.1 Minimum requirements of the braking system

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.2.6.2 Braking performance

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 4.2.2.7: Ensuring that the train is in running order

## 4.2.2.7.1 General requirement

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.2.7.2 Data required

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 4.2.3: SPECIFICATIONS RELATING TO TRAIN OPERATIONS

## 4.2.3.1 Train planning

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.3.2 Identification of trains

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 4.2.3.3: Train departure

## 4.2.3.3.1 Checks and tests before departure

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.3.3.2 Informing the Infrastructure Manager of the train's operational status

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 4.2.3.4: Traffic management

## 4.2.3.4.1 General requirements

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 4.2.3.4.2: Train reporting

## 4.2.3.4.2.1 Data required for train position reporting

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.3.4.2.2 Predicted hand over time

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.3.4.3 Dangerous goods

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.3.4.4 Operational quality

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.3.5 Data recording

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.3.5.1 Recording of supervision data outside the train

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.3.5.2 Recording of supervision data on-board the train

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 4.2.3.6: Degraded operation

## 4.2.3.6.1 Advice to other users

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.3.6.2 Advice to train drivers

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.3.6.3 Contingency arrangements

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.3.7 Managing an emergency situation

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.3.8 Aid to traincrew in the event of an incident or of a major rolling stock malfunction

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.3 FUNCTIONAL AND TECHNICAL SPECIFICATIONS OF THE INTERFACES

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.3.1 INTERFACES WITH THE INFRASTRUCTURE TSI

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 4.3.2: INTERFACES WITH THE CONTROL/COMMAND AND SIGNALLING TSI

## 4.3.2.1 Recording of supervision data

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.3.2.2 Driver vigilance

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.3.2.3 ERTMS/ETCS and ERTMS/GSM-R operating rules

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.3.2.4 Signal and lineside marker sighting

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.3.2.5 Train braking

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.3.2.6 Use of sanding. Minimum elements relevant to professional qualifications for the task of driving a train

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.3.2.7 Data recording and hot axle box detection

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 4.3.3: INTERFACES WITH THE ROLLING STOCK TSI

## 4.3.3.1 Vehicle identification

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.3.3.2 Braking

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.3.3.3 Requirements for passenger vehicles

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.3.3.4 Train visibility

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.3.3.4.1 On the leading vehicle of a train facing in the direction of travel

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.3.3.4.2 On the rear end

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.3.3.5 Train audibility

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.3.3.6 Signal sighting

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.3.3.7 Driver vigilance

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.3.3.8 Train composition and annex B

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.3.3.9 Freight Vehicle loading

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.3.3.10 Ensuring that the train is in running order and Dangerous goods

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.3.3.11 Train composition, Annex L

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.3.3.12 Contingency arrangements and Managing an emergency situation

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.3.3.13 Data recording

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 4.3.4: INTERFACES WITH THE TSI TELEMATIC APPLICATIONS

## 4.3.4.1 Identification of trains

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.3.4.2 Train composition

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.3.4.3 Train departure

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.3.4.4 Train running

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.3.4.5 Vehicle identification

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.4 OPERATING RULES

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.5 MAINTENANCE RULES

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.6 PROFESSIONAL QUALIFICATIONS

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.6.1 PROFESSIONAL COMPETENCY

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.6.1.1 Professional knowledge

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.6.1.2 Ability to put this knowledge into practice

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 4.6.2: LINGUISTIC COMPETENCY

## 4.6.2.1 Principles

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.6.2.2 Level of knowledge

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 4.6.3: INITIAL AND ONGOING ASSESSMENT OF STAFF

## 4.6.3.1 Basic elements

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 4.6.3.2: Analysis of training needs

## 4.6.3.2.1 Development of the analysis of training needs

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.6.3.2.2 Updating the analysis of training needs

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 4.6.3.2.3: Specific elements for traincrew and auxiliary staff

## 4.6.3.2.3.1 Route knowledge

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.6.3.2.3.2 Knowledge of rolling stock

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.6.3.2.3.3 Auxiliary staff

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 4.7: HEALTH AND SAFETY CONDITIONS

## 4.7.1 INTRODUCTION

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.7.2 CRITERIA FOR APPROVAL OF OCCUPATIONAL DOCTORS AND MEDICAL ORGANISATIONS

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 4.7.3: CRITERIA FOR APPROVAL OF PSYCHOLOGISTS INVOLVED IN PSYCHOLOGICAL ASSESSMENT AND PSYCHOLOGICAL ASSESSMENT REQUIREMENTS

## 4.7.3.1 Certification of psychologists

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.7.3.2 Content and interpretation of psychological assessment

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.7.3.3 Selection of assessment tools

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 4.7.4: MEDICAL EXAMINATIONS AND PSYCHOLOGICAL ASSESSMENTS

### Division 4.7.4.1: Before appointment:

## 4.7.4.1.1 Minimum content of the medical examination

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.7.4.1.2 Psychological assessment

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 4.7.4.2: After appointment

## 4.7.4.2.1 Periodicity of periodic medical examinations

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.7.4.2.2 Minimum content of the periodic medical examination

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.7.4.2.3 Additional medical examinations and/or psychological assessments

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 4.7.5: MEDICAL REQUIREMENTS

## 4.7.5.1 General requirements

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.7.5.2 Vision requirements

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.7.5.3 Hearing requirements

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.7.5.4 Pregnancy

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 4.7.6: SPECIFIC REQUIREMENTS REGARDING THE TASK OF DRIVING A TRAIN

## 4.7.6.1 Periodicity of periodic medical examinations

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.7.6.2 Additional content of medical examination

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.7.6.3 Additional vision requirements

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.7.6.4 Additional hearing and speaking requirements

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.7.6.5 Anthropometrics

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.7.6.6 Trauma Counselling

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.8 INFRASTRUCTURE AND ROLLING STOCK REGISTERS

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.8.1 INFRASTRUCTURE

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.8.2 ROLLING STOCK

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 5: INTEROPERABILITY CONSTITUENTS

## 5.1 DEFINITION

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 5.2 LIST OF CONSTITUENTS

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 5.3 CONSTITUENTS' PERFORMANCES AND SPECIFICATIONS

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 6: ASSESSMENT OF CONFORMITY AND/OR SUITABILITY FOR USE OF THE CONSTITUENTS AND VERIFICATION OF THE SUBSYSTEM

## 6.1 INTEROPERABILITY CONSTITUENTS

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 6.2: TRAFFIC OPERATION AND MANAGEMENT SUBSYSTEM

## 6.2.1 PRINCIPLES

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 6.2.2 RULES AND PROCEDURES DOCUMENTATION

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 6.2.3: ASSESSMENT PROCEDURE

## 6.2.3.1 Decision by the Competent Authority

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 6.2.3.2 If an assessment is required

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 6.2.4 SYSTEM PERFORMANCE

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 7: IMPLEMENTATION

## 7.1 PRINCIPLES

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 7.2 IMPLEMENTATION GUIDELINES

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 7.3: SPECIFIC CASES

## 7.3.1 INTRODUCTION

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 7.3.2 LIST OF SPECIFIC CASES

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## ANNEX A 

ERTMS/ETCS AND ERTMS/GSM-R OPERATING RULES
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## ANNEX B OTHER RULES ENABLING A COHERENT OPERATION OF NEW STRUCTURAL SUBSYSTEMS:

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
A.
General
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
B.
Staff Safety and Security
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
C.
Operational interface with signalling and command and control equipment
C1
Sanding
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
C2
Activation of Hot Axle Box Detectors
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
D.
Train Movements
D1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
D2
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
E.
Anomalies, incidents and accidents
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## ANNEX C SAFETY RELATED COMMUNICATIONS METHODOLOGY

Introduction
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.
COMMUNICATIONS METHODOLOGY
1.1.
ELEMENTS AND PRINCIPLES OF THE METHODOLOGY
1.1.1.
STANDARD TERMINOLOGY TO BE USED IN THE PROCEDURES
1.1.1.1.
Speech transmission procedure
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.1.1.2.
Message receiving procedure
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.1.1.3.
Communications breaking procedure
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.1.1.4.
Cancelling a written order
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.1.2.
PRINCIPLES TO BE APPLIED IN THE EVENT OF ERROR OR MISUNDERSTANDING
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.1.2.1.
Errors
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.1.2.2.
Misunderstanding
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.1.3.
WORD, NUMBER, TIME, DISTANCE, SPEED AND DATE SPELLING CODE
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.1.3.1.
Spelling out of words and letter groups
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.1.3.2.
Expression of numbers
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.1.3.3.
Expression of time
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.1.3.4.
Expression of distances and speeds
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.1.3.5.
Expression of dates
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.2.
COMMUNICATIONS STRUCTURE
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.2.1.
RULES FOR IDENTIFICATION AND REQUESTS FOR INSTRUCTION
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.2.1.1.
Identification
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.2.1.2.
Request for instructions
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.2.2.
RULES FOR TRANSMISSION OF WRITTEN ORDERS AND VERBAL MESSAGES
1.2.2.1.
Top priority safety messages
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.2.2.2.
Written Orders
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.2.2.2.1.
Message sending
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.2.2.2.2.
Message receiving
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.2.2.2.3.
Read-back
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.2.2.2.4.
Acknowledgement of correct read-back
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.2.2.2.5.
Acknowledgement
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.2.2.2.6.
Traceability and verification
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.2.2.2.7.
Reporting Back
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.2.2.3.
Additional messages
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.2.2.4.
Information messages with a variable non-predetermined content
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.
PROCEDURAL MESSAGES
2.1.
NATURE OF THE MESSAGES
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.2.
FORMS
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.3.
BOOK OF FORMS
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.
ADDITIONAL MESSAGES
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.1.
GUIDELINE STRUCTURE FOR MESSAGES
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.2.
GLOSSARY OF RAILWAY TERMINOLOGY
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.3.
DESCRIPTIVE DIAGRAM OF THE ROLLING STOCK
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.4.
DESCRIPTIVE STATEMENT OF THE CHARACTERISTICS OF THE INFRASTRUCTURE EQUIPMENT (TRACK, TRACTION SUPPLY, ETC.)
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.
TYPE AND STRUCTURE OF VERBAL MESSAGES
4.1.
EMERGENCY MESSAGES
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.2.
MESSAGES SENT EITHER BY THE GROUND OR THE DRIVER
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.3.
MESSAGES ISSUED BY THE DRIVER
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## ANNEX D INFORMATION TO WHICH THE RAILWAY UNDERTAKING MUST HAVE ACCESS IN CONNECTION WITH THE ROUTE(S) OVER WHICH HE INTENDS TO OPERATE

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## ANNEX E LANGUAGE AND COMMUNICATION LEVEL

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## ANNEX F: TRAFFIC OPERATION AND MANAGEMENT SUBSYSTEM ASSESSMENT GUIDELINES

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.
This annex sets out guidelines to facilitate assessments by Member States to confirm that the operational process(es) proposed:
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.
The Infrastructure Manager or Railway Undertaking concerned must supply the Member State with appropriate documentation (as described in clause 3 below) describing the new or amended operations process(es).
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.1.
The documentation describing the operational process(es) concerned should contain at least the following elements:
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.2.
The Member State shall:
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.
The assessment report shall include at least the following information:
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## ANNEX G INFORMATIVE AND NOT MANDATORY LIST OF ELEMENTS TO BE VERIFIED FOR EACH BASIC PARAMETER

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## ANNEX H MINIMUM ELEMENTS RELEVANT TO PROFESSIONAL QUALIFICATION FOR THE TASK OF DRIVING A TRAIN

1.
General requirements
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.
Professional knowledge
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.1.
General professional knowledge
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.2.
Knowledge of operational procedures and safety systems applied to the infrastructure to be used
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.3.
Knowledge of rolling stock
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.
Route knowledge
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.
Ability to put the knowledge into practise
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.1.
Prepare for duty
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.2.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.3.
Take part in checking the operation of the brakes on the train
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.4.
Drive the train respecting the appropriate safety regulations, driving rules and timetable
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.5.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.6.
Apply measures relating to operational incidents and accidents, particularly those relating to train protection and to fire or dangerous goods
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.7.
Determine the conditions to continue to run after incidents affecting the rolling stock
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.8.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.9.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.10.
Report any unusual occurrences concerning the operation of the train, the conditions of the infrastructure etc.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## ANNEX I NOT USED

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## ANNEX J MINIMUM ELEMENTS RELEVANT TO PROFESSIONAL QUALIFICATION FOR THE TASKS ASSOCIATED WITH ‘ACCOMPANYING TRAINS’

1.
General requirements
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.
Professional knowledge
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.1.
General professional knowledge
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.2.
Knowledge of operational procedures and safety systems applied to the infrastructure to be used
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.3.
Knowledge of rolling stock
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.4.
Knowledge of the route
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.
Ability to put the knowledge into practise
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## ANNEX K NOT USED

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## ANNEX L MINIMUM ELEMENTS RELEVANT TO PROFESSIONAL QUALIFICATION FOR THE TASK OF PREPARING TRAINS

1.
General requirements
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.
Professional knowledge
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.1
General professional knowledge
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.2
Knowledge of operational procedures and safety systems applied to the infrastructure to be used
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.3
Knowledge of train equipment
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.
Ability to put the knowledge into practise
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## ANNEX M NOT USED

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## ANNEX N IMPLEMENTATION GUIDELINES

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## ANNEX O NOT USED

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## ANNEX P VEHICLE IDENTIFICATION

General remarks:
1.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.
The conformity of the number and linked marking with the indications described in this annex is not mandatory for:
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Standard number and linked abbreviations
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Allocation of number
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## ANNEX P.1 KEEPER'S ABBREVIATION MARKING

Definition of the Vehicle Keeper Marking (VKM)
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Format of the Vehicle Keeper Marking
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Exemptions for using a Vehicle Keeper Marking
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Provisions about allocation of Vehicle Keeper Markings
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Register of Vehicle Keeper Markings and procedure for allocation
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## ANNEX P.2 INSCRIPTION OF THE NUMBER AND LINKED ALPHABETICAL MARKING ON THE BODYWORK

General arrangements for external markings
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Wagons
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Coaches and hauled passenger stock
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Locomotives, power cars and special vehicles
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## ANNEX P.3 RULES FOR THE DETERMINATION OF THE CHECK-DIGIT (DIGIT 12)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## ANNEX P.4 CODING OF THE COUNTRIES IN WHICH THE VEHICLES ARE REGISTERED (DIGITS 3-4 AND ABBREVIATION)

‘Information relating to third countries given for information purposes only.’
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## ANNEX P.5 ALPHABETICAL MARKING OF THE INTEROPERABILITY CAPABILITY

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Notes:
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## ANNEX P.6 INTEROPERABILITY CODES USED FOR WAGONS (DIGITS 1-2).

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## ANNEX P.7 INTERNATIONAL TRAFFIC ABILITY CODES USED FOR HAULED PASSENGER VEHICLES (DIGITS 1-2)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## ANNEX P.8 TYPES OF TRACTIVE STOCK (DIGITS 1-2)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## ANNEX P.9 STANDARD NUMERICAL MARKING OF WAGONS (DIGITS 5 TO 7)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## ANNEX P.10 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## ANNEX P.11 CODES FOR THE TECHNICAL CHARACTERISTICS OF THE SPECIAL VEHICLES (DIGIT 6 TO 8)

Authorised speed for special vehicles (digit 6)
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Type and sub-type of special vehicle (digits 7-8)
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## ANNEX P.12 LETTER MARKING FOR WAGONS EXCLUDING ARTICULATED AND MULTIPLE WAGONS

DEFINITION OF THE CATEGORY AND INDEX LETTERS
1.
Important notes
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.
Index letters with an international value common to all categories
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.
Index letters with an national value
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
CATEGORY LETTER: E — OPEN HIGH-SIDED WAGON
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
CATEGORY LETTER: F — OPEN HIGH-SIDED WAGON
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
CATEGORY LETTER: G — COVERED WAGON
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
CATEGORY LETTER: H — COVERED WAGON
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
CATEGORY LETTER: I — TEMPERATURE-CONTROLLED WAGON
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
CATEGORY LETTER: K — 2-AXLE FLAT WAGON
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
CATEGORY LETTER: L — 2-AXLE FLAT WAGON
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
CATEGORY LETTER: O — MIXED FLAT AND OPEN HIGH-SIDED WAGON
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
CATEGORY LETTER: R — FLAT BOGIES WAGON
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
CATEGORY LETTER: S — FLAT BOGIES WAGON
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
CATEGORY LETTER: T — WAGON WITH OPENING ROOF
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
CATEGORY LETTER: U — SPECIAL WAGONS
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
CATEGORY LETTER: Z — TANK WAGON
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
LETTER MARKING FOR WAGONS FOR ARTICULATED AND MULTIPLE WAGONS
DEFINITION OF THE CATEGORY AND INDEX LETTERS
1.
Important notes
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.
Index letters with an international value common to all categories
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.
Index letters with a national value
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
CATEGORY LETTER: F — OPEN HIGH-SIDED WAGON
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
CATEGORY LETTER: H — COVERED WAGON
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
CATEGORY LETTER: I — TEMPERATURE CONTROLLED WAGON
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
CATEGORY LETTER: L — FLAT WAGON WITH SEPARATE AXLES
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
CATEGORY LETTER: S — FLAT BOGIE WAGON
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
CATEGORY LETTER: T — WAGON WITH OPENING ROOF
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
CATEGORY LETTER: U — SPECIAL WAGONS
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
CATEGORY LETTER: Z — TANK WAGON
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## ANNEX P.13 LETTER MARKING FOR HAULED PASSENGER STOCK

Serial letters with an international value:
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Index letters with an international value:
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Serial letters and index letters with a national value
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## ANNEX P.14 

Letter marking for special vehicles
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## ANNEX Q NOT USED

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## ANNEX R TRAIN IDENTIFICATION

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## ANNEX S: TRAIN VISIBILITY — REAR END

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## ANNEX T 

BRAKING PERFORMANCE
IM’s role
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
RU’s role
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Braking performance not achieved
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## ANNEX U 

LIST OF OPEN POINTS
Section 4.2.2 —
Train Composition Document
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## ANNEX V PREPARATION AND UPDATING RULES DOCUMENTATION FOR DRIVERS

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## GLOSSARY 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

---
Source: https://www.legislation.gov.uk/eudn/2006/920 (the official version)
Page: https://openlegislation.uk/eu-decision-2006-920
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

