# Commission Decision of 6 March 2008 concerning a technical specification for interoperability relating to the ‘energy’ sub-system of the trans-European high-speed rail system (notified under document number C(2008) 807) (Text with EEA relevance) (2008/284/EC) (repealed)

EU Decision 2008/284 · adopted 6 March 2008

Commission Decision of 6 March 2008 concerning a technical specification for interoperability relating to the ‘energy’ sub-system of the trans-European high-speed rail system (notified under document number C(2008) 807) (Text with EEA relevance) (2008/284/EC) (repealed)

## Introductory text

Commission Decision
of 6 March 2008
concerning a technical specification for interoperability relating to the ‘energy’ sub-system of the trans-European high-speed rail system
(notified under document number C(2008) 807)
(Text with EEA relevance)
(2008/284/EC) (repealed)
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 1 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 2 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 3 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 5 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 6 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 7 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 8 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 9 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## Annex: DIRECTIVE 96/48/EC — INTEROPERABILITY OF THE TRANS-EUROPEAN HIGH SPEED RAIL SYSTEM

### Division 1: INTRODUCTION

## 1.1 Technical scope

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 1.2 Geographical scope

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 1.3 Content of this TSI

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 2: SUBSYSTEM DEFINITION/SCOPE

## 2.1 Scope

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 2.2: Definition of the subsystem

## 2.2.1 Electrification system

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 2.2.2 Geometry of Overhead contact line and pantograph

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 2.2.3 Interaction of overhead contact line and pantograph

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 2.2.4 Transition between high-speed lines and other lines

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 2.3: Links with other subsystems and within the subsystem

## 2.3.1 Introduction

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 2.3.2 Links concerning electrification system

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 2.3.3 Links concerning overhead line equipment and pantographs

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 2.3.4 Links concerning interaction of overhead contact line and pantograph

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 2.3.5 Links concerning phase and system separation sections

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 3: ESSENTIAL REQUIREMENTS

## 3.1 General

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 3.2 Essential requirements for the Energy subsystem

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 3.3: Specific aspects for the Energy subsystem

## 3.3.1 Safety

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 3.3.2 Reliability and availability

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 3.3.3 Health

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 3.3.4 Environmental protection

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 3.3.5 Technical compatibility

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 3.3.6 Maintenance

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 3.3.7 Operations

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 3.4 Essential Requirements Summary Table

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 4: CHARACTERISATION OF THE SUBSYSTEM

## 4.1 Introduction

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 4.2: Functional and technical specifications of the subsystem

## 4.2.1 General provisions

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.2 Voltage and frequency

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.3 System performance and installed power

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.4 Regenerative braking

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.5 Harmonic emissions towards the power utility

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.6 External electromagnetic compatibility

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.7 Continuity of power supply in case of disturbances

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.8 Protection of the environment

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 4.2.9: Overhead contact line

## 4.2.9.1 Overall design

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 4.2.9.2: Geometry of overhead contact line

## 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## Lines of category II and III:

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## All Lines

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.10 Compliance of the overhead contact line system with infrastructure gauge

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.11 Contact wire material

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.12 Contact wire wave propagation speed

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.13 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.14 Static contact force

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.15 Mean contact force

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 4.2.16: Dynamic behaviour and quality of current collection

## 4.2.16.1 Requirements

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 4.2.16.2: Conformity Assessment

## 4.2.16.2.1 Interoperability Constituent Overhead Contact Line

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.16.2.2 Interoperability Constituent Pantograph

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.16.2.3 IC OCL in a newly installed line (Integration into a Subsystem)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.16.2.4 IC Pantograph integrated into new rolling stock

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.16.2.5 Statistical calculations and simulations

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.17 Vertical movement of the contact point

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.18 Current capacity of the overhead contact line system: AC and DC systems, trains in motion

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.19 Pantograph spacing used for the design of the overhead contact line

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.20 Current capacity, DC systems, trains at standstill

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 4.2.21: Phase separation sections

## 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## Lines of category I

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## Lines of category II and III

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 4.2.22: System separation sections

## 4.2.22.1 General

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.22.2 Pantographs raised

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.22.3 Pantographs lowered

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.23 Electrical Protection Coordination Arrangements

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.24 Effects of DC operation on AC systems

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.25 Harmonics and Dynamic Effects

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 4.3: Functional and technical specifications for the interfaces

## 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.3.1 High Speed Rolling stock subsystem

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.3.2 High Speed Infrastructure subsystem

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.3.3 High Speed Control-Command and Signalling subsystem

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.3.4 High Speed Traffic Operations and Management

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.3.5 Safety in Railway Tunnels

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 4.4: Operating rules

## 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.4.1 Management of power supply in case of danger

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.4.2 Execution of works

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.4.3 Day-to-day management of power supply

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 4.5: Maintenance of power supply and overhead contact line system

## 4.5.1 Manufacturer’s Responsibility

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.5.2 Infrastructure Manager’s Responsibility

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.6 Professional competences

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 4.7: Health and safety conditions

## 4.7.1 Protective provisions of substations and posts

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.7.2 Protective provisions of overhead contact line system

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.7.3 Protective provisions of current return circuit

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.7.4 Other general requirements

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.7.5 High Visibility Clothing

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.8 Register of infrastructure and European register of authorised types of vehicles

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.8.1 Infrastructure Register

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.8.2 Rolling Stock Register

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 5: INTEROPERABILITY CONSTITUENTS

## 5.1 Definitions

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 5.2 Innovative solutions

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 5.3 List of interoperability constituents

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 5.4: Constituents’ performances and specifications

### Division 5.4.1: Overhead contact line

## 5.4.1.1 Overall design

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 5.4.1.2 Geometry

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 5.4.1.3 Current capacity

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 5.4.1.4 Contact wire material

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 5.4.1.5 Current at standstill

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 5.4.1.6 Wave propagation speed

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 5.4.1.7 Design for pantograph spacing

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 5.4.1.8 Mean contact force

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 5.4.1.9 Dynamic behaviour and quality of current collection

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 5.4.1.10 Vertical movement of contact point

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 5.4.1.11 Space for uplift

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 6: ASSESSMENT OF CONFORMITY AND/OR SUITABILITY FOR USE

### Division 6.1: Interoperability constituents

## 6.1.1 Assessment procedures and modules

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 6.1.2: Application of modules

## 6.1.2.1 General

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 6.1.2.2 Existing solutions for Interoperability Constituents

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 6.1.2.3 Innovative solutions for Interoperability Constituents

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 6.2: Energy subsystem

## 6.2.1 Assessment procedures and modules

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 6.2.2: Application of modules

## 6.2.2.1 General

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 6.2.2.2 Innovative solutions

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 6.2.3 Assessment of maintenance

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 6.3 Validity of certificates issued against the previous published version of the TSI

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 6.4: Interoperable constituents not holding an EC Declaration

## 6.4.1 General

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 6.4.2 The transition period

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 6.4.3: The certification of subsystems containing non-certified interoperability constituents during the transition period

## 6.4.3.1 Conditions

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 6.4.3.2 Notification

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 6.4.3.3 Lifecycle Implementation

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 6.4.4 Monitoring arrangements

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 7: IMPLEMENTATION OF THE ENERGY TSI

## 7.1 Application of this TSI to new high-speed lines being put into service

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 7.2: Application of this TSI to high-speed lines already in service

## 7.2.1 Introduction

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 7.2.2 Classification of works

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 7.2.3 Parameters and specifications concerning the complete subsystem

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 7.2.4 Parameters concerning the mechanical parts of the OCL and the power supply

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 7.2.5 Parameters concerning the contact wire

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 7.2.6 Parameters related to other directives, to operational and maintenance

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 7.2.7 Scope of application

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 7.3 TSI Revision

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 7.4: Specific cases

## 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 7.4.1: Particular features on the Austrian network

## 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## Category II and III lines

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## Category III lines (T1 case)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 7.4.2: Particular features on the Belgian network

## 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## Existing category I lines

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## Category II and III lines

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 7.4.3 Particular features on the German network

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 7.4.4 Particular features on the Spanish network

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 7.4.5: Particular features on the French network

## 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## Category I lines

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## Category I lines (T2 case)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## Category II and III lines (T2 case)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 7.4.6: Particular features on the British network

## 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## Contact wire height

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## Contact wire lateral deviation under the action of cross wind.

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## Peak Contact Force at Discrete Locations

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## Phase Separation sections

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## Pantograph Gauge Envelope

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## Voltage and frequency

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## Maximum train current

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 7.4.7 Particular features on the Eurotunnel network

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 7.4.8: Particular features on the Italian network

## Existing category I lines (T1 case)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## Existing category I lines (P case)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## Category II and III DC lines (T1 case)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 7.4.9 Particular features on the Irish and Northern Irish networks

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 7.4.10 Particular features on the Swedish network

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 7.4.11 Particular features on the Finnish network

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 7.4.12 Particular features on the Polish network

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 7.4.13: Particular features on the Danish network including the Öresund link to Sweden

## 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## Category II and III lines

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 7.4.14 Particular features on the Norwegian network — For information only

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 7.4.15 Particular features on the Swiss network — For information only

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 7.4.16 Particular features on the Lithuanian network

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 7.4.17 Particular features on the Netherlands network

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 7.4.18 Particular features on the Slovakian network

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 7.5: Agreements

## 7.5.1 Existing agreements

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 7.5.2 Future agreements

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## ANNEX A Conformity modules

A.1.
List of the modules
Modules for Interoperability Constituents
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Modules for Subsystems
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
A.2.
Modules for Interoperability Constituents
Module A1: Internal Design Control with Production Verification
1.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5.1.
Verification by examination and testing of every product
5.1.1.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5.1.2.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5.2.
Statistical verification
5.2.1.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5.2.2.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5.2.3.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5.2.4.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5.2.5.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
7.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
8.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Module B: Type Examination
1.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.1.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.2.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.3.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.4.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.5.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.6.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.7.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.8.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
7.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
8.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
9.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
10.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Module C: Conformity to type
1.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Module H1: Full Quality Management System
1.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.1.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.2.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.3.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.4.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.1.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.2.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.3.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.4.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
7.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
8.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
9.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Module H2: Full Quality Management System with Design Examination
1.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.1.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.2.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.3.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.4.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.1.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.2.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.3.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.4.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6.1.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6.2.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6.3.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6.4.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6.5.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6.6.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
7.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
8.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
9.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
10.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
A.3.
Modules for Subsystems
Module SG: Unit verification
1.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
7.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
8.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
9.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Module SH2: Full Quality Management System with Design Examination
1.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.1.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.2.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.3.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.4.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.5.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5.1.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5.2.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5.3.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5.4.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5.5.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6.1.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6.2.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6.3.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6.4.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6.5.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
7.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
8.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
9.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
10.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
11.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
12.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
A.4.
Assessment of Maintenance Arrangements: Conformity Assessment Procedure
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## ANNEX B Conformity Assessment of Interoperability Constituents

B.1.
Scope
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
B.2.
Characteristics
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## ANNEX C Assessment of the Energy Subsystem

C.1.
Scope
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
C.2.
Characteristics and Modules
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## ANNEX D Infrastructure Register, Information on the Energy Subsystem

D.1.
Scope
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
D.2.
Characteristics to be Described
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## ANNEX E Rolling Stock Register, Information Required by the Energy Subsystem

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## ANNEX F Specific Case — Great Britain — Pantograph Envelope

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## ANNEXES G TO K ARE NOT USED 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## ANNEX L List of Open Points

4.2.15.
Mean contact force
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.2.20.
Current at Standstill (DC Systems)
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.2.24.
Effects of DC operation on AC systems
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

---
Source: https://www.legislation.gov.uk/eudn/2008/284 (the official version)
Page: https://openlegislation.uk/eu-decision-2008-284
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

