OpenLegislation

Division 4 Level of co-financing

United Kingdom

Original text. Later amendments are not shown.

The preparatory action will be divided in two phases:

  • Phase 1 shall include a feasibility study, recommendations and specifications for the establishment of a certification scheme for control posts with a maximum amount granted of EUR 300 000 covering at maximum 90 % of the eligible costs,

  • Phase 2 shall include the building or the renovation of pilot control posts and the validation of a experimental certification scheme for control posts to be harmonised with EU requirements with a maximum amount granted of EUR 3 700 000 and at maximum 70 % of the total eligible costs of the operation. This action shall cover at least three Member States and it shall depend on the approval of the feasibility study of Phase 1.