OpenLegislation

Annex II CONFORMITY ASSESSMENT PROCEDURESF1

United Kingdom Repealed

Original text. Later amendments are not shown.

  1. Module AInternal production control
  2. Module A1Internal production control plus supervised product testing
  3. Module A2Internal production control plus supervised product checks at random intervals
  4. Module BEC-type examination
  5. Module CConformity to type based on internal production control
  6. Module C1Conformity to type based on internal production control plus supervised product testing
  7. Module C2Conformity to type based on internal production control plus supervised product checks at random intervals
  8. Module DConformity to type based on quality assurance of the production process
  9. Module D1Quality assurance of the production process
  10. Module EConformity to type based on product quality assurance
  11. Module E1Quality assurance of final product inspection and testing
  12. Module FConformity to type based on product verification
  13. Module F1Conformity based on product verification
  14. Module GConformity based on unit verification
  15. Module HConformity based on full quality assurance
  16. Module H1Conformity based on full quality assurance plus design examination
  17. TABLE: CONFORMITY ASSESSMENT PROCEDURES IN COMMUNITY LEGISLATION

Annotations

Textual amendments

F1

Decision revoked (31.12.2020) by The Plant Protection Products (Miscellaneous Amendments) (EU Exit) Regulations 2019 (S.I. 2019/556), Sch. 2 Pt. 2 (with reg. 29(2)) (as amended by S.I. 2020/1376, regs. 1(4), 3(20)); 2020 c. 1, Sch. 5 para. 1(1); and also expressed to be revoked (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), Sch. 37 para. 1(c) (as amended by S.I. 2020/676, regs. 1(1), 3); 2020 c. 1, Sch. 5 para. 1(1)