Annex II CONFORMITY ASSESSMENT PROCEDURESF1
United Kingdom Repealed
- Module AInternal production control
- Module A1Internal production control plus supervised product testing
- Module A2Internal production control plus supervised product checks at random intervals
- Module BEC-type examination
- Module CConformity to type based on internal production control
- Module C1Conformity to type based on internal production control plus supervised product testing
- Module C2Conformity to type based on internal production control plus supervised product checks at random intervals
- Module DConformity to type based on quality assurance of the production process
- Module D1Quality assurance of the production process
- Module EConformity to type based on product quality assurance
- Module E1Quality assurance of final product inspection and testing
- Module FConformity to type based on product verification
- Module F1Conformity based on product verification
- Module GConformity based on unit verification
- Module HConformity based on full quality assurance
- Module H1Conformity based on full quality assurance plus design examination
- TABLE: CONFORMITY ASSESSMENT PROCEDURES IN COMMUNITY LEGISLATION
Annotations
Textual amendments
- F1
Decision revoked (31.12.2020) by The Plant Protection Products (Miscellaneous Amendments) (EU Exit) Regulations 2019 (S.I. 2019/556), Sch. 2 Pt. 2 (with reg. 29(2)) (as amended by S.I. 2020/1376, regs. 1(4), 3(20)); 2020 c. 1, Sch. 5 para. 1(1); and also expressed to be revoked (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), Sch. 37 para. 1(c) (as amended by S.I. 2020/676, regs. 1(1), 3); 2020 c. 1, Sch. 5 para. 1(1)