# Commission Decision of 19 November 2008 establishing detailed guidelines for the implementation and application of Annex II to Directive 2004/8/EC of the European Parliament and of the Council (notified under document number C(2008) 7294) (Text with EEA relevance) (2008/952/EC), Division 7.2

Extent: E+W+S+N.I.

For the CHP part, the plant operator shall check the load pattern (useful heat demand) and evaluate whether the unit operates in full cogeneration mode during certain periods. If this is the case, the plant operator shall measure actual heat and electrical energy output from the cogeneration unit for this situation and during these periods. These data will allow him to determine the actual ‘power to heat ratio’ (Cactual).

---
Source: https://www.legislation.gov.uk/eudn/2008/952/annex/division/I/division/7/division/7.2 (the official version)
Page: https://openlegislation.uk/eu-decision-2008-952/annex/division-I/division-7/division-7.2
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

