OpenLegislation

Article 5

United Kingdom

Original text. Later amendments are not shown.

1.

In the case of loss of structural integrity for tailings dams, human lives shall be deemed to be threatened where water or slurry levels are at least 0,7 m above ground or where water or slurry velocities exceed 0,5 m/s.

2.

The assessment of the potential for loss of life and danger to human health, shall comprise at least the following factors:

(a)

the size and properties of the facility including its design;

(b)

the quantity and quality including physical and chemical properties of the waste in the facility;

(c)

the topography of the facility site, including damping features;

(d)

the travel time of a potential flood-wave to areas where people are present;

(e)

the propagation velocity of the flood-wave;

(f)

the predicted water or slurry level;

(g)

the rising rate of water or slurry levels;

(h)

any relevant, site-specific factors that may influence the potential for loss- of- life or for danger to human health.