# Commission Decision of 20 April 2009 determining the Community position for a decision of the management entities under the Agreement between the Government of the United States of America and the European Community on the coordination of energy-efficiency labelling programmes for office equipment on the revision of the imaging equipment specifications in Annex C, part VII, to the Agreement (2009/347/EC), Division (ii): Procedure for copiers, digital duplicators and MFDs without print capability

Extent: E+W+S+N.I.

Table 7
TEC test procedure — Copiers, digital duplicators and MFDs without print capability
Notes:
— Before beginning the test, it is helpful to check the power-management default delay times to ensure they are as-shipped, and to confirm that there is plenty of paper in the device.
— The ‘Zero meter’ instruction may be carried out by recording the accumulated energy consumption at that time rather than literally zeroing the meter.
— Step 1 — The off measurement period can be longer if desired, to reduce measurement error. Note that the off power is not used in the calculations.
— Step 2 — If the unit has no ready indicator, use the time at which the power consumption level stabilises to the ready level.
— Step 3 — After recording the Active0 time, the remainder of this job can be cancelled.
— Step 4 — If the unit turns off within this hour, record the sleep energy and time at that point in time, but wait until a full hour has elapsed since the final sleep mode was initiated before beginning step 5. Note that the sleep power measurement is not used within the calculation, and the unit may enter auto-off within the full hour.
— Step 5 — The period of 15 minutes is from job initiation. In order to be evaluated by this test procedure, products must be able to complete the required job per the job table within the 15-minute job interval.
— Step 6 — A unit that is shipped with short default delay times might begin steps 6-8 from sleep or auto-off.
— Step 9 — If the unit has already entered auto-off before the start of step 9, then the values for final energy and final time are zero.
— Step 10 — The auto-off testing interval may be longer to improve accuracy.
Step
Initial state
Action
Record (at end of step)
Possible states measured
1
Off
Plug the unit into meter. Zero the meter; wait test period (five minutes or more).
Off energy
Off
Testing interval time
2
Off
Turn on unit. Wait until unit indicates it is in ready mode.
—
—
3
Ready
Copy a job of at least one image but no more than a single job per job table. Record time to first sheet exiting unit. Wait until the meter shows that the unit has entered its final sleep mode.
Active0 time
—
4
Sleep
Zero meter; wait one hour. If unit turns Off in less than one hour, record time and energy in sleep, but wait full hour before moving to step 5.
Sleep energy
Sleep
Testing interval time
5
Sleep
Zero meter and timer. Copy one job per job table. Record time to first sheet exiting unit. Wait until timer shows that 15 minutes have elapsed.
Job1 energy
Recovery, active, ready, sleep, auto-off
Active1 time
6
Ready
Repeat step 5.
Job2 energy
Same as above
Active2 time
7
Ready
Repeat step 5 (without active time measurement).
Job3 energy
Same as above
8
Ready
Repeat step 5 (without active time measurement).
Job4 energy
Same as above
9
Ready
Zero meter and timer. Wait until meter and/or unit shows that unit has entered its auto-off mode.
Final energy
Ready, sleep
Final time
10
Auto-off
Zero the meter; wait test period (five minutes or more).
Auto-off energy
Auto-off
Originals may be placed in the document feeder before the test begins. Products without a document feeder may make all images from a single original placed on the platen.

---
Source: https://www.legislation.gov.uk/eudn/2009/347/annex/division/ANNEX/division/VII/division/D/division/2/division/d/division/ii (the official version)
Page: https://openlegislation.uk/eu-decision-2009-347/annex/division-ANNEX/division-VII/division-D/division-2/division-d/division-ii
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

