# Commission Decision of 20 April 2009 determining the Community position for a decision of the management entities under the Agreement between the Government of the United States of America and the European Community on the coordination of energy-efficiency labelling programmes for office equipment on the revision of the imaging equipment specifications in Annex C, part VII, to the Agreement (2009/347/EC), Division: Additional measurement for products with a digital front-end (DFE)

Extent: E+W+S+N.I.

This step applies only to products that have a DFE as defined in Section A.32.
If the DFE has a separate mains power cord, regardless of whether the cord and controller are internal or external to the imaging product, a five-minute energy measurement of the DFE alone is to be made while the main product is in ready mode. The unit must be connected to a network if network-capable as shipped.
If the DFE does not have a separate mains power cord, the manufacturer must document the AC power required for the DFE when the unit as a whole is in a ready mode. This will most commonly be accomplished by taking an instantaneous power measurement of the DC input to the DFE and increasing this power level to account for losses in the power supply.

---
Source: https://www.legislation.gov.uk/eudn/2009/347/annex/division/ANNEX/division/VII/division/D/division/3/division/d/division/1 (the official version)
Page: https://openlegislation.uk/eu-decision-2009-347/annex/division-ANNEX/division-VII/division-D/division-3/division-d/division-1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

