{
  "url": "https://openlegislation.uk/eu-decision-2009-489/annex/division-Appendix/division-III/division-1/division-9",
  "json_url": "https://openlegislation.uk/eu-decision-2009-489/annex/division-Appendix/division-III/division-1/division-9.json",
  "legislation": "eudn/2009/489",
  "legislation_title": "Commission Decision of 16 June 2009 determining the Community position for a decision of the Management entities under the Agreement between the Government of the United States of America and the European Community on the coordination of energy-efficiency labelling programmes for office equipment on the revision of the computer specifications in Annex C, part VIII, to the Agreement (Text with EEA relevance) (2009/489/EC)",
  "legislation_url": "https://openlegislation.uk/eu-decision-2009-489",
  "path": "annex/division/Appendix/division/III/division/1/division/9",
  "kind": "division",
  "number": "9",
  "heading": "* Ensure that the UUT is configured as shipped including all accessories, WOL enabling, and software shipped by default. UUT should also be configured using the following requirements for all tests:",
  "text": "(a) Desktop systems shipped without accessories should be configured with a standard mouse, keyboard and external computer display.\n(b) Notebooks should include all accessories shipped with the system, and need not include a separate keyboard or mouse when equipped with an integrated pointing device or digitizer.\n(c) Notebooks should have the battery pack(s) removed for all tests. For systems where operation without a battery pack is not a supported configuration, the test may be performed with fully charged battery pack(s) installed, making sure this configuration is reported in the test results.\n(d) Small-Scale Servers and Thin Clients shipped without accessories should be configured with a standard mouse, keyboard and external computer display (if server has display output functionality).\n(e) For Computers with Ethernet capability, power to wireless radios should be turned off for all tests. This applies to wireless network adapters (e.g. 802,11) or device-to-device wireless protocols. For Computers without Ethernet capability, power to a wireless LAN radio (e.g. IEEE 802,11) should remain on during testing and must maintain a live wireless connection to a wireless router or network access point, which supports the highest and lowest data speeds of the client radio, for the duration of testing.\n(f) Primary hard drives may not be power managed (spun-down) during Idle testing unless they contain non-volatile cache integral to the drive (e.g. ‘hybrid’ hard drives). If more than one internal hard drive is installed as shipped, the non-primary, internal hard drive(s) may be tested with hard drive power management enabled as shipped. If these additional drives are not power managed when shipped to customers, they must be tested without such features implemented.",
  "extent": "E+W+S+N.I.",
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/eudn/2009/489/annex/division/Appendix/division/III/division/1/division/9",
    "retrieved_at": "2026-11-01T15:16:27.855461+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}