# Commission Decision of 30 June 2009 establishing a template for National Renewable Energy Action Plans under Directive 2009/28/EC of the European Parliament and of the Council (notified under document number C(2009) 5174) (Text with EEA relevance) (2009/548/EC), Division 4.2.1: Administrative procedures and spatial planning (Article 13(1) of Directive 2009/28/EC)

Extent: E+W+S+N.I.

When answering the following questions, Member States are requested to explain the current national, regional and local rules concerning the authorisation, certification and licensing procedures applied to plants and associated transmission and distribution network infrastructure for the production of electricity, heating or cooling from renewable sources, and to the process of transformation of biomass into biofuels or other energy products. Where further steps are needed to ensure that procedures are proportionate and necessary, Member States are requested also to describe planned revisions, expected results and the authority responsible to carry out such revisions. When information is technology specific, please indicate it. When regional/local authorities have a substantial role, please also explain it.
(a) List of existing national and, if applicable, regional legislation concerning authorisation, certification, licensing procedures and spatial planning applied to plants and associated transmission and distribution network infrastructure:
(b) Responsible Ministry(/ies)/authority(/ies) and their competences in the field:
(c) Revision foreseen with the view to take appropriate steps as described by Article 13(1) of Directive 2009/28/EC by: [date]
(d) Summary of the existing and planned measures at regional/local levels (where relevant):
(e) Are there unnecessary obstacles or non-proportionate requirements detected related to authorisation, certification and licensing procedures applied to plants and associated transmission and distribution network infrastructure for the production of electricity, heating or cooling from renewable sources, and to the process of transformation of biomass into biofuels or other energy products? If so, what are they?
(f) What level of administration (local, regional and national) is responsible for authorising, certifying and licensing renewable energy installations and for spatial planning? (If it depends on the type of installation, please specify.) If more than one level is involved, how is coordination between the different levels managed? How will coordination between different responsible authorities be improved in the future?
(g) How is it ensured that comprehensive information on the processing of authorisation, certification and licensing applications and on assistance to applicants made available? What information and assistance is available to potential applicants for new renewable energy installations on their applications?
(h) How is horizontal coordination facilitated between different administrative bodies, responsible for the different parts of the permit? How many procedual steps are needed to receive the final authorisation/licence/permit? Is there a one-stop shop for coordinating all steps? Are timetables for processing applications communicated in advance? What is the average time for obtaining a decision for the application?
(i) Do authorisation procedures take into account the specificities of the different renewable energy technologies? If so, please describe how. If they do not, do you envisage taking them into account in the future?
(j) Are there specific procedures, for example simple notification, for small-scale, decentralised installations (such as solar panels on buildings or biomass boilers in buildings)? If so, what are the procedual steps? Are the rules publicly available to citizens? Where are they published? Is the introduction of simplified notification procedures planned in the future? If so, for which types of installation/system? (Is net metering possible?)
(k) Where are the fees associated with applications for authorisation/licences/permits for new installations published? Are they related to the administrative costs of granting such permits? Is there any plan to revise these fees?
(l) Is official guidance available to local and regional administrative bodies on planning, designing, building and refurbishing industrial and residential areas to install equipments and systems using renewable energy sources in electricity and heating and cooling, including in district heating and cooling? If such official guidance is not available or insufficient, how and when will this need be addressed?
(m) Are there specific trainings for case handlers of authorisation, certification and licensing procedures of renewable energy installations?

---
Source: https://www.legislation.gov.uk/eudn/2009/548/annex/division/4/division/4.2/division/4.2.1 (the official version)
Page: https://openlegislation.uk/eu-decision-2009-548/annex/division-4/division-4.2/division-4.2.1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

