Division 29
United Kingdom
For incineration and co-incineration processes, what are the maximum permissible periods of operation during abnormal operation before the plant must shut down:
- (a)
maximum permissible period with exceedence of emission limit values;
- (b)
maximum cumulative duration of periods exceeding emission limit values over 1 year.