# Commission Implementing Decision of 28 February 2012 establishing the best available techniques (BAT) conclusions under Directive 2010/75/EU of the European Parliament and of the Council on industrial emissions for iron and steel production (notified under document C(2012) 903) (Text with EEA relevance) (2012/135/EU), Division: Applicability

Extent: E+W+S+N.I.

At some plants, the existing configuration may make costs of heat recovery from the sinter waste gases or sinter cooler waste gas very high.
The recovery of heat from the waste gases by means of a heat exchanger would lead to unacceptable condensation and corrosion problems.

---
Source: https://www.legislation.gov.uk/eudn/2012/135/annex/division/3/division/1.2/division/4/division/32/division/2 (the official version)
Page: https://openlegislation.uk/eu-decision-2012-135/annex/division-3/division-1.2/division-4/division-32/division-2
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

