BAT is to reduce noise emissions from electric arc furnace (EAF) installations and processes generating high sound energies by using a combination of the following constructional and operational techniques depending on and according to local conditions (in addition to using the techniques listed in BAT 18):
- I..
construct the electric arc furnace (EAF) building in such a way as to absorb noise from mechanical shocks resulting from the operation of the furnace
- II..
construct and install cranes destined to transport the charging baskets to prevent mechanical shocks
- III..
special use of acoustical insulation of the inside walls and roofs to prevent the airborne noise of the electric arc furnace (EAF) building
- IV..
separation of the furnace and the outside wall to reduce the structure-borne noise from the electric arc furnace (EAF) building
- V..
housing of processes generating high sound energies (i.e. electric arc furnace (EAF) and decarburisation units) within the main building.