# Commission Decision of 6 November 2012 amending Decision 2012/88/EU on the technical specifications for interoperability relating to the control-command and signalling subsystems of the trans-European rail system (notified under document C(2012) 7325) (Text with EEA relevance) (2012/696/EU), Article 1

Extent: E+W+S+N.I.

Decision 2012/88/EU is amended as follows:
(1) Article 6 is deleted.
(2) The following Article is inserted:
‘Article 6a When implementing the TSI set out in Annex III to this Decision, one of the two sets of specifications listed in table A-2 of Annex A shall be applied. Baseline 3 specifications shall be maintained in order to ensure that trains equipped with Baseline 3-compliant ERTMS/ETCS can run on Baseline 2-compliant ERTMS/ETCS lines without any additional technical or operational restrictions.’
(3) Annex A is replaced by Annex I to this Decision.
(4) Annex G is replaced by Annex II to this Decision

---
Source: https://www.legislation.gov.uk/eudn/2012/696/article/1 (the official version)
Page: https://openlegislation.uk/eu-decision-2012-696/article-1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.