# Commission Decision of 14 November 2012 concerning the technical specification for interoperability relating to the ‘operation and traffic management’ subsystem of the rail system in the European Union and amending Decision 2007/756/EC (notified under document C(2012) 8075) (Text with EEA relevance) (2012/757/EU), Division 2.2.2: Principles

Extent: E+W+S+N.I.

This TSI covers those elements (as set out in Chapter 4) of the rail ‘ operation and traffic management ’ subsystem, where principally there are operational interfaces between RU and IM and where there is a particular benefit to interoperability.
RU and IM must ensure that all requirements concerning rules and procedures as well as documentation are met by the establishment of the appropriate processes. The set up of these processes is a relevant part of RU’s and IM’s safety management system (hereinafter referred to as ‘SMS’) as required by Directive 2004/49/EC . The SMS itself is assessed by the relevant national safety authority (hereinafter referred to as ‘NSA’) before granting safety certificate/authorisation.

---
Source: https://www.legislation.gov.uk/eudn/2012/757/annex/I/division/2/division/2.2/division/2.2.2 (the official version)
Page: https://openlegislation.uk/eu-decision-2012-757/annex-I/division-2/division-2.2/division-2.2.2
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

