# Commission Decision of 14 November 2012 concerning the technical specification for interoperability relating to the ‘operation and traffic management’ subsystem of the rail system in the European Union and amending Decision 2007/756/EC (notified under document C(2012) 8075) (Text with EEA relevance) (2012/757/EU), Division 4.2.3.4.2.2: Predicted handover time

Extent: E+W+S+N.I.

The infrastructure manager must have a process, which enables an indication of the estimated number of minutes of deviation from the scheduled time a train is scheduled to be handed over from one infrastructure manager to another.
This must include information on service disruption (description and location of problem).

---
Source: https://www.legislation.gov.uk/eudn/2012/757/annex/I/division/4/division/4.2/division/4.2.3/division/4.2.3.4/division/4.2.3.4.2/division/4.2.3.4.2.2 (the official version)
Page: https://openlegislation.uk/eu-decision-2012-757/annex-I/division-4/division-4.2/division-4.2.3/division-4.2.3.4/division-4.2.3.4.2/division-4.2.3.4.2.2
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

