Division 4 Monitoring requirements (Article 16)
United Kingdom
Provide a summary of any Member State policy or guidance on the following issues and, if published on the internet, a link to where this can be found:
- 4.1.
How is it ensured that the BAT conclusions are the basis for defining monitoring requirements in permits (Article 16(1))?
- 4.2.
How is the frequency of periodic monitoring for soil and groundwater determined (Article 16(2))?
- 4.3.
How is a ‘systematic appraisal of risk of contamination’ used to justify the monitoring of soil and groundwater at less than the stipulated frequency (Article 16(2))?