Division 8 Site closure (Article 22)
United Kingdom
- 8.1.
How is it decided which activities require a baseline report, especially:
- (a)
Which activities listed in Annex I to Directive 2010/75/EU have typically been found to involve the ‘use, production or release of relevant hazardous substances’ (Article 22(2))?
- (b)
How is regard given to the ‘possibility of soil and groundwater contamination at the site of the installation’ (Article 22(2))?
- (c)
What information are operators required to include in baseline reports (Article 22(2))?
- (d)
How has the Commission’s guidance on ‘the content of the baseline report’ been used in this context (Article 22(2))?
- (a)
- 8.2.
Upon the definitive cessation of activities:
- (a)
How do operators ‘assess the state of soil and groundwater contamination’ (Article 22(3))?
- (b)
How is it decided whether an installation has caused ‘significant pollution of soil or groundwater’ (Article 22(3))?
- (c)
How is it decided whether any contamination of soil or groundwater ‘poses a significant risk to human health or the environment’ (Article 22(3))?
- (d)
How is it decided what necessary ‘measures’ or ‘actions’ are required of operators (Article 22(3) and (4))?
- (a)