# Commission Decision of 25 January 2012 on the technical specification for interoperability relating to the control-command and signalling subsystems (notified under document C(2012) 172) (Text with EEA relevance) (2012/88/EU) (repealed)

EU Decision 2012/88 · adopted 25 January 2012

Commission Decision of 25 January 2012 on the technical specification for interoperability relating to the control-command and signalling subsystems (notified under document C(2012) 172) (Text with EEA relevance) (2012/88/EU) (repealed)

## Introductory text

Commission Decision
of 25 January 2012
on the technical specification for interoperability relating to the control-command and signalling subsystems
(notified under document C(2012) 172)
(Text with EEA relevance)
(2012/88/EU) (repealed)
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 1 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 2 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 3 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 5 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 6 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 6a 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 7 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 7a 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 8 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 9 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## Annex I 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## Annex II 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 1: INTRODUCTION

## 1.1 Technical scope

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 1.2 Geographical scope

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 1.3 Content of this TSI

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 2: SUBSYSTEM DEFINITION AND SCOPE

## 2.1 Introduction

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 2.2 Scope

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 2.3 Application levels (ERTMS/ETCS)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 3: THE ESSENTIAL REQUIREMENTS FOR THE CONTROL-COMMAND AND SIGNALLING SUBSYSTEMS

## 3.1 General

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 3.2: Specific Aspects of the Control-Command and Signalling Subsystems

## 3.2.1 Safety

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 3.2.2 Reliability and Availability

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 3.2.3 Health

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 3.2.4 Environmental Protection

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 3.2.5 Technical Compatibility

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 3.2.5.1: Engineering Compatibility

## 3.2.5.1.1 Physical environmental conditions

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 3.2.5.1.2 Railway Internal Electromagnetic Compatibility

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 3.2.5.2 Control-Command and Signalling Compatibility.

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 4: CHARACTERISATION OF THE SUBSYSTEMS

## 4.1 Introduction

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 4.2: Functional and technical specifications of the Subsystems

## 4.2.1 Control-Command and Signalling safety characteristics relevant to interoperability

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.1.1 Safety

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.1.2 Availability/Reliability

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.2 On-board ERTMS/ETCS functionality

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.3 Track-side ERTMS/ETCS functionality

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.4 Mobile communication functions for railways GSM-R

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.4.1 Basic communication function

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.4.2 Voice and operational communication applications

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.4.3 Data communication applications for ETCS

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.5 ERTMS/ETCS and GSM-R air gap interfaces

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.5.1 Radio communications with the train

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.5.2 Eurobalise communication with the train

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.5.3 Euroloop communication with the train

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.6 On-Board Interfaces Internal to Control-Command and Signalling

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.6.1 ERTMS/ETCS and Class B train protection

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.6.2 Interface between GSM-R Radio Data Communication and ERTMS/ETCS

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.6.3 Odometry

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.7 Track-side Interfaces Internal to Control-Command and Signalling

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.7.1 Functional interface between RBCs

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.7.2 RBC/RBC

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.7.3 GSM-R/track-side ETCS

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.7.4 Eurobalise/LEU

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.7.5 Euroloop/LEU

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.8 Key Management

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.9 ETCS-ID Management

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.10 Track-side Train Detection Systems

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.11 Electromagnetic Compatibility between Rolling Stock and Control-Command and Signalling track-side equipment

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.12 ERTMS/ETCS DMI (Driver Machine Interface)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.13 GSM-R DMI (Driver-Machine Interface)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.14 Interface to Data Recording for Regulatory Purposes

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.15 Visibility of track-side Control-Command and Signalling objects

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.2.16 Environmental conditions

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 4.3: Functional and technical specifications of the interfaces to other Subsystems

## 4.3.1 Interface to the Traffic Operation and Management Subsystem

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.3.2 Interface to the Rolling Stock Subsystem

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.3.3 Interfaces to Infrastructure Subsystem

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.3.4 Interfaces to Energy Subsystem

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.4 Operating rules

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.5 Maintenance rules

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.5.1 Responsibility of the manufacturer of equipment

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.5.2 Responsibility of the applicant for subsystem verification

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.6 Professional competences

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.7 Health and safety conditions

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 4.8 Registers

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 5: INTEROPERABILITY CONSTITUENTS

## 5.1 Definition

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 5.2: List of interoperability constituents

## 5.2.1 Basic interoperability constituents

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 5.2.2 Grouping of interoperability constituents

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 1 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 2 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 5.3 Constituents’ performance and specifications

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## Table 5.1.a Basic interoperability constituents in the Control-Command and Signalling On-board Subsystem

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 6: ASSESSING THE CONFORMITY AND/OR SUITABILITY FOR USE OF THE CONSTITUENTS AND VERIFYING THE SUBSYSTEMS

### Division 6.1: Introduction

## 6.1.1 General principles

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 6.1.2 Principles for testing ERTMS/ETCS and GSM-R

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 6.2: Interoperability constituents

## 6.2.1 Assessment procedures for Control-Command and Signalling Interoperability Constituents

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 6.2.2 Modules for Control-Command and Signalling Interoperability Constituents

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 6.2.3 Assessment requirements

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 6.2.4: Special issues

## 6.2.4.1 The on-board ERTMS/ETCS

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 6.2.4.2 The Specific Transmission Module (STM)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 6.2.4.3 Content of the ‘EC’ Declaration of conformity

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 6.3: Control-Command and Signalling Subsystems

## 6.3.1 Assessment procedures for Control-Command and Signalling Subsystems

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 6.3.2 Modules for Control-Command and Signalling Subsystems

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 6.3.2.1 On-board Subsystem

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 6.3.2.2 Track-side Subsystem

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 6.3.2.3 Conditions for using modules for On-board and Track-side Subsystems

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 6.3.3 Assessment requirements for an On-board Subsystem

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 6.3.4 Assessment requirements for a Track-side Subsystem

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 6.4: Provisions in case of the partial fulfilment TSI requirements

## 6.4.1 Assessment of parts of control-command and signalling subsystems

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 6.4.2 Control-command and signalling subsystems' partial fulfilment of the requirements due to limited application of the TSI

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 6.4.3 Intermediate Statement of Verification

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 7: IMPLEMENTING THE TSI CONTROL-COMMAND AND SIGNALLING

## 7.1 Introduction

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 7.2: Generally applicable rules

## 7.2.1 Upgrading or renewing the Control-Command Track-side Subsystem or parts of it

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 7.2.2 Legacy systems

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 7.2.3 Availability of Specific Transmission Modules

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 7.2.4 Additional Class B equipment on a line equipped with Class A

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 7.2.5 Rolling stock with Class A and Class B equipment

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 7.2.6 Conditions for mandatory and optional functions

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 7.2.7: GSM-R specific implementation rules

## 7.2.7.1 Track-side installations

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 7.2.7.2 On-board installations

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 7.2.8 Train detection systems specific implementation rules

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 7.2.9: Specific cases

## 7.2.9.1 Introduction

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 7.2.9.2 Belgium

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 7.2.9.3 United Kingdom

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 7.2.9.4 France

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 7.2.9.5 Poland

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 7.2.9.6 Lithuania, Latvia and Estonia

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 7.2.9.7 Sweden

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 7.2.9.8 Luxembourg

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 7.3: Rules for ERTMS

## 7.3.1 The ERTMS European Deployment Plan

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 7.3.2 ERTMS Track-side Implementation

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 7.3.2.1 Corridors

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 7.3.2.2 Connection to the main European ports, marshalling yards, freight terminals and freight transport areas

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 7.3.2.3 High-speed network

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 7.3.2.4 EU-funded projects

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 7.3.2.5 Notification

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 7.3.2.6 Delays

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 7.3.3: ERTMS on-board implementation

## 7.3.3.1 New vehicles

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 7.3.3.2 Upgrading and renewal of existing vehicles

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 7.3.3.3 Additional requirements

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

### Division 7.3.4: Specific lines constituting the corridors

## Corridor A – to be equipped by 2015

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## Corridor B

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## Corridor C

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## Corridor D

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## Corridor E

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## Corridor F

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## 7.3.5 Main European ports, marshalling yards, freight terminals and freight transport areas

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## ANNEX A 

References
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table A 1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Specifications
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table A 2
List of mandatory specifications
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Table A 3
List of mandatory standards
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## ANNEX B 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## ANNEX C 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## ANNEX D 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## ANNEX E 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## ANNEX F 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

## ANNEX G 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

---
Source: https://www.legislation.gov.uk/eudn/2012/88 (the official version)
Page: https://openlegislation.uk/eu-decision-2012-88
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

