# Commission Implementing Decision of 26 March 2013 establishing the best available techniques (BAT) conclusions under Directive 2010/75/EU of the European Parliament and of the Council on industrial emissions for the production of cement, lime and magnesium oxide (notified under document C(2013) 1728) (Text with EEA relevance) (2013/163/EU), Division: DEFINITIONS

Extent: E+W+S+N.I.

For the purposes of these BAT conclusions, the following definitions apply:
Term used
Definition
New plant
A plant introduced on the site of the installation following the publication of these BAT conclusions or a complete replacement of a plant on the existing foundations of the installation following the publication of these BAT conclusions
Existing plant
A plant which is not a new plant
Major upgrade
An upgrade of the plant/kiln involving a major change in the kiln requirements or technology, or replacement of the kiln
'Use of waste as fuel and/or raw material'
The term covers the use of:
waste fuels with significant calorific value; and
waste materials without significant calorific value but with mineral components used as raw materials that contribute to the intermediate product clinker; and
waste materials that have both a significant calorific value and mineral components

---
Source: https://www.legislation.gov.uk/eudn/2013/163/annex/division/3 (the official version)
Page: https://openlegislation.uk/eu-decision-2013-163/annex/division-3
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.