{
  "url": "https://openlegislation.uk/eu-decision-2013-163/annex/division-5/division-1.2/division-1.2.3/division-1.2.3.1/division-6/division-3",
  "json_url": "https://openlegislation.uk/eu-decision-2013-163/annex/division-5/division-1.2/division-1.2.3/division-1.2.3.1/division-6/division-3.json",
  "legislation": "eudn/2013/163",
  "legislation_title": "Commission Implementing Decision of 26 March 2013 establishing the best available techniques (BAT) conclusions under Directive 2010/75/EU of the European Parliament and of the Council on industrial emissions for the production of cement, lime and magnesium oxide (notified under document C(2013) 1728) (Text with EEA relevance) (2013/163/EU)",
  "legislation_url": "https://openlegislation.uk/eu-decision-2013-163",
  "path": "annex/division/5/division/1.2/division/1.2.3/division/1.2.3.1/division/6/division/3",
  "kind": "division",
  "number": null,
  "heading": "BAT-associated energy consumption levels",
  "text": "See Table 1.\nTable 1\nBAT-associated energy consumption levels for new plants and major upgrades using dry process kiln with multistage preheating and precalcination\nLevels do not apply to plants producing special cement or white cement clinker that require significantly higher process temperatures due to product specifications.\nUnder normal (excluding, e.g. start-ups and shutdowns) and optimised operational conditions.\nThe production capacity has an influence on the energy demand, with higher capacities providing energy savings and smaller capacities requiring more energy. Energy consumption also depends on the number of cyclone preheater stages, with more cyclone preheater stages leading to lower energy consumption of the kiln process. The appropriate number of cyclone preheater stages is mainly determined by the moisture content of raw materials.\nProcess\nUnit\nBAT-associated energy consumption levels\nDry process with multistage preheating and precalcination\nMJ/tonne clinker\n2 900 – 3 300",
  "extent": "E+W+S+N.I.",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "footnote",
      "label": "f1",
      "text": "Levels do not apply to plants producing special cement or white cement clinker that require significantly higher process temperatures due to product specifications."
    },
    {
      "type": "footnote",
      "label": "f2",
      "text": "Under normal (excluding, e.g. start-ups and shutdowns) and optimised operational conditions."
    },
    {
      "type": "footnote",
      "label": "f3",
      "text": "The production capacity has an influence on the energy demand, with higher capacities providing energy savings and smaller capacities requiring more energy. Energy consumption also depends on the number of cyclone preheater stages, with more cyclone preheater stages leading to lower energy consumption of the kiln process. The appropriate number of cyclone preheater stages is mainly determined by the moisture content of raw materials."
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/eudn/2013/163/annex/division/5/division/1.2/division/1.2.3/division/1.2.3.1/division/6/division/3",
    "retrieved_at": "2026-11-01T15:15:07.930990+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}