# Commission Implementing Decision of 26 March 2013 establishing the best available techniques (BAT) conclusions under Directive 2010/75/EU of the European Parliament and of the Council on industrial emissions for the production of cement, lime and magnesium oxide (notified under document C(2013) 1728) (Text with EEA relevance) (2013/163/EU), Division: Description

Extent: E+W+S+N.I.

For safety reasons, due to the risk of explosions, ESPs will have to shut down during elevated CO levels in the flue-gases. The following techniques prevent CO trips and, therefore, reduce ESP shutdown times:
control of the combustion process
control of the organic load of raw materials
control of the quality of the fuels and fuel feeding system.
Disruptions predominantly happen during the start-up operation phase. For safe operation, the gas analysers for ESP protection have to be online during all operational phases and the ESP downtime can be reduced by using a backup monitoring system maintained in operation.
The continuous CO monitoring system needs to be optimised for reaction time and should be located close to the CO source, e.g. at a preheater tower outlet, or at a kiln inlet in the case of a wet kiln application.

---
Source: https://www.legislation.gov.uk/eudn/2013/163/annex/division/5/division/1.4/division/1.4.4/division/1.4.4.3/division/1.4.4.3.2/division/64/division/1 (the official version)
Page: https://openlegislation.uk/eu-decision-2013-163/annex/division-5/division-1.4/division-1.4.4/division-1.4.4.3/division-1.4.4.3.2/division-64/division-1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.