  "legislation_title": "Commission Decision of 21 August 2013 on the establishment of the annual priority lists for the development of network codes and guidelines for 2014 (Text with EEA relevance) (2013/442/EU)",
  "legislation_url": "https://openlegislation.uk/eu-decision-2013-442",
  "path": "article/1",
  "kind": "article",
  "number": "1",
  "heading": null,
  "text": "The Commission establishes for the development of harmonised electricity rules this annual priority list for 2014:\ncapacity allocation and congestion management rules including governance for day-ahead and intraday markets including capacity calculation (Commission adoption phase),\nnetwork connection rules:\nrules on requirements for generators (Commission adoption phase)\nrules on distribution system operator and industrial load connection (Commission adoption phase)\nrules on high-voltage direct current transmission system connection (finalise network code and start Commission adoption phase),\nsystem operation rules:\nrules on operational security (Commission adoption phase)\nrules on operational planning and scheduling (Commission adoption phase)\nrules on load-frequency control and reserves (Commission adoption phase)\nrules on emergency requirements and procedures (finalise network code and start Commission adoption phase),\nbalancing rules including network-related reserve power (Commission adoption phase),\nrules for longer term (forward) capacity allocation (Commission adoption phase),\nrules regarding harmonised transmission tariff structures (scoping by ACER to prepare framework guideline).",
  "extent": "E+W+S+N.I.",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "footnote",
      "label": "f1",
      "text": "Rules on operational training and on requirements and operational procedures in emergency will follow later."
    },
    {
      "type": "footnote",
      "label": "f2",
      "text": "Regarding rules on investment incentives, the TEN-E Regulation notably Article 13, provides for rules to ensure that appropriate incentives are granted to infrastructure projects of common interest in gas and electricity, which are subject to higher risks than normally incurred. In this context, the TEN-E Regulation sets out the following tasks: each national regulatory authority to submit to ACER its methodology and criteria used to evaluate investments and the higher risks incurred by them, where available, by 31 July 2013, ACER to facilitate the sharing of good practices and to make recommendations by 31 December 2013, each national regulatory authority to publish its respective methodology and the criteria used to evaluate investments and the higher risks incurred by them by 31 March 2014. Based on the input from the abovementioned tasks, the European Commission will decide whether legally binding guidelines need to be issued."
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/eudn/2013/442/article/1",
    "retrieved_at": "2026-11-01T15:15:01.393434+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}